Afrindustria/ Gas Gap Monitor

Library / MIDSREAM-AND-DOWNSTREAM-PETROLEUM-OPERATIONS-REGULATIONS

MIDSREAM-AND-DOWNSTREAM-PETROLEUM-OPERATIONS-REGULATIONS

Page 33 of 42

Open the PDF at page 33

B 100 
J. 
| BULK GAS STORAGE FACILITIES (GAS DEPOT) 
I. 
| Licence to Establish 
USD 5.000 
N/A 
2. 
| Licence to Construct 
USD 5.000 
NGN 100.000 
3. 
| Licence to Operate (New and | USD2.500 for capacities 
<= 
NGN 500.000 
Renewal) 
3000MTT or part thereor 
4. 
| Tank Calibration Approval 
NGN 500,000 per tank 
N/A 
5. 
| Hydrotest 
and 
Integrity 
| NGN 500,000 per tank 
N/A 
Approval 
6. 
| Pre-Commissioning 
USD 1200 or its NGN equivalent 
N/A 
Commissioning Approval 
7. 
| LPG Offtake Permit 
USD 1200 or its NGN equivalent 
NGN 109,000/ 
S000MT 
8 | Category 
D 
and 
Not exceeding 500 kilograms 
Not exceeding 500 
Distribution Centres (MDC | (kg)=NGN 15.000 
kilograms (kg) 
= 
(New/Renewal) 
NGNS,000 
Additional 500 kg or part thereof | 
Additional 500 kg 
=NGN 20,000 
or part thereof = 
NGNS,000 
Exceeding 2,000 kg = 
Exceeding 2.000 kg 
NGN100,000 
=NGN 20,000 
9. 
| Periodic Conformity 
USD1,000 
N/A 
Assessment 
K. 
| BULK PETROLEUM LIQUID STORAGE (CRUDE OIL. STORAGE) 
1. 
| Licence to Establish 
USD 20.000 for capacities 0 - 
USD 2.000 
50,000 BBL 
USD 50.000 for capacities 
between 50,000 and 100.000 
BPSD 
USD 100.000 for capacities 
above 100,000 BBL 
2. 
| Licence to Construct 
USD 20,000 for capacities 0 - 
USD 2.000 
50,000 BBL 
USD 50,000 for capacities 
between 50,000 and 100,000 
BPSD 
USD 100,000 for capacities 
N/A 
above 100,090 BBL 
3. 
| Licence 
to Operate (LTO) 
USD 20,000 for capacities 0 - 
USD 2,000 
(New and Renewal) 
50,000 BBL 
USD 50,000 for capacities 
between 50.000 and 109.000 
BPSD 
USD 100,000 for capacities 
above 160,000 BBL