19. 
| Operating a lubricant filling plant without LTO. 
NGN 2,000,000 per year of 
operation without a licence 
30. 
| Late renewal of lubricant filling plant LTO beyond 31st March | NGN 100,000 
of every year. 
. 
21. 
| Procurement 
of critical equipment without Factory 
NGN 5,000,000 
Acceptance Test for lubricant filling plant. 
2. 
| Construction of a lubricant filling plant without valid LTE. 
| NGN3,000,000 
23. 
| Construction of lubricant filling plant without valid LTC. 
NGN 3,000,000 
24. 
| Modification ofa lubricant filling plant without authorization. 
| NGN3,000,000 
25. 
| Operation of lubricant filling Plant without valid LTO. 
NGN 3,000,000 
26. 
| Distributors operating without lubricant storage and sales 
| NGN 200,000 per year 
licence. 
27. 
| Retailers operating without lubricant storage and sales 
| NGN 100,000 per year 
licence. 
28. 
| Engagement of non- Authority accredited contractors for} 
Not more than USD 
fabrication, construction, calibration, testing, or any other | 250,000 and suspension of 
midstream and downstream activities. 
not more than 
| year 
29. 
| Carrying out midstream and downstream activities without | Not more than USD 250.000 
Authority oil and gas industry service permit. 
and suspension of not 
: 
: 
more than 
| year 
30. 
| Using storage or changing tank product or pipeline product | USD 5,000 
service without authorisation. 
31. 
| Measuring petroleum at custody transfer or sales points | USD 10,000 and seizure of 
with faulty or uncalibrated measuring equipment, Ullage | faulty measuring 
Transmitting Instrument (UTI) or metering System. 
instrument 
32. 
| Measuring petroleum products with faulty or uncalibrated | NGN 100,000 and seizure of 
measuring equipment or Ullage Transmitting Instrument] 
faulty measuring 
(UTI). 
instrument 
33. 
| Conducting a factory acceptance test or site acceptance | USD250,000 
test of any critical equipment without authorisation and 
witnessing by officers of the Authority. 
34. 
| Modification, repair, or alteration of surface or underground | USD 25,000 
crude oil storage tanks without authorisation. 
35. 
| Introduction of deadwoods, capillary tube or false bottom, 
| USD 25,000 
etc in crude oil storage tanks. 
36. 
| Construction of a depot without LTC. 
USD 100,000 
37. 
| Operation of a depot without LTO. 
NGN 10,000,000 
38. 
| Modification of a depot without authorisation. 
USD 100,000 
39. 
| Failure to calibrate storage Tank. 
NGN 250,000 per tank 
40. 
| Backloading in a depot without authorisation. 
USD5,000