Library / Midstream and Downstream Decommissioning and Abandonment Regulations Under Section 232 and 233 of the Petroleum Industry Act (2021). DRAFT DATE: 10/06/2022
Midstream and Downstream Decommissioning and Abandonment Regulations Under Section 232 and 233 of the Petroleum Industry Act (2021). DRAFT DATE: 10/06/2022
Page 6 of 13
(viii) Details of interaction between any part of the pipelines and other uses of the sea (in particular fishing activity, marine traffic, marker buoy positioning both historical and where relevant to estimate future activity). (ix) Materials on the seabed – drill cuttings (amount, composition, dimensions), debris, any other materials. b. Where there is a related equipment that is not covered by the decommissioning and abandonment programme, details shall be provided for such equipment and explanation provided of why it is not part of the programme. c. Proposals for identification and removal of seabed debris following decommissioning and abandonment works. As a minimum the area covered for debris clearance should include a 500meter radius around any installation and a 100meter (50meter either side of the pipeline) corridor along the length of any pipelines. Following the work, verification of seabed clearance by an independent organisation is required. d For the removal and disposal methods, details of any materials and remains on the seabed after decommissioning and abandonment. e. Proposals covering the post-decommissioning and abandonment phase – (i) Seabed sampling surveys to monitor levels of hydrocarbons, heavy metals and other contaminants in sediments and biota. (ii) Inspection and maintenance where any installation, structure or pipeline remained disused and in position or are to be partly removed. Where any installation, structure or pipeline is partly removed, the licencee shall remain liable for any residual liability arising from the installation, structure or pipeline not removed and appropriately marked. f. Analysis indicating that the proposal complies with the standards prescribed by the international maritime organisation on offshore petroleum installations and structures. Approval of an Application for Decommissioning and Abandonment by the Authority 14 (1) The Authority shall approve an application for a decommissioning and abandonment programme within one hundred and eighty (180) days after the date of submission of the application provided the application meets the following criteria- (a) The programme is accordance with the approved decommissioning and abandonment plan (b) the programme addresses considerations and recommendations raised by the Authority and the public consultations in the light of individual circumstances; (c) where applicable, the potential for reuse of a transportation pipeline together with other existing facility in connection with further hydrocarbon developments is considered before decommissioning and abandonment; (d) all feasible decommissioning and abandonment options have been considered and a satisfactory comparative assessment made;
RegulationsPDF6