Library / Midstream and Downstream Decommissioning and Abandonment Regulations 2023
Midstream and Downstream Decommissioning and Abandonment Regulations 2023
Page 10 of 18
B 836 (e) proposals covering the post-decommissioning and abandonment phase — (i) seabed sampling surveys to monitor levels of hydrocarbons, heavy metals and other contaminants in sediments and biota, and (ii) inspection and maintenance where any installation, structure or pipeline remained disused and in position or are to be partly removed, and where any installation, structure or pipeline is partly removed, the licensee shall remain liable for any residual liability arising from the installation, structure or pipeline not removed and appropriately marked ; and (f ) analysis indicating that the proposal complies with the standards prescribed by the international maritime organisation on offshore petroleum installations and structure. 13.—(1) The Authority shall approve an application for a Programme within 120 days of submission : Provided that — (a) the Programme is in accordance with the approved Plan ; (b) the Programme addresses considerations and recommendations raised by the Authority and the public consultations in the light of individual circumstances ; (c) where applicable, the potential for reuse of a transportation pipeline together with other existing facility in connection with further hydrocarbon developments is considered before decommissioning and abandonment ; (d) all feasible decommissioning and abandonment options have been considered and a satisfactory comparative assessment made ; (e) any removal or partial removal of an installation, structure or transportation pipeline is performed in a manner that guarantees sustainable environmental development ; (f ) any recommendation to leave an installation, structure or gathering line in place is made with regard to its likely deterioration and to the present, possible and future effects on the environment and in the case of offshore installations and structure, consistent with the applicable international petroleum industry best practices ; and (g) relevant environmental, technical, and commercial regulations or standards are complied with. (2) The Authority shall notify the licensee of its decision in writing where it declines an approval for the Programme and state the reasons for the refusal. (3) Where the Authority fails to notify the licensee of its decision on the application within 120 days from the date of submission of the application as prescribed in these Regulation, the application shall be deemed approved. Approval of an application for a Programme
RegulationsPDF20232023-0610