Library / Midstream and Downstream Decommissioning and Abandonment Regulations 2023
Midstream and Downstream Decommissioning and Abandonment Regulations 2023
Page 7 of 18
B 833 (2) A licensee shall make an application to the Authority for the approval to decommission and abandon any midstream or downstream petroleum facility or infrastructure on land at least 24 months before the date of the Programme. (3) An application under subregulation (2) shall be accompanied by a Programme in a Form prescribed by the Authority which shall comprise of — (a) the location of the facility intended to be decommissioned and abandoned ; (b) the part of the facility intended to be decommissioned and abandoned, including a single installation or pipeline ; (c) an executive summary, outlining the background to the decommissioning and abandonment proposals and highlighting the essential features of the proposed method of decommissioning and abandonment, the chosen decommissioning and abandonment options, key execution decisions, key risk management considerations and details on schedule ; (d) background information, supported by diagrams, schematics and relevant photographs including — (i) location and main infrastructure map of all land areas relevant to the Programme, (ii) the relative location, geographical information system, type, and status of any other adjacent facilities (such as high-tension power lines, pipelines, midstream installations and facilities) which would have to be taken into consideration, (iii) information about any commercial activity in the area, and (iv) any other background information relevant to consideration of the Programme ; (e) description of items to be decommissioned and abandoned, inclusive of diagrams, covering — (i) support structure for fixed installations at the time of removal (type, size, arrangement and weights), (ii) land based loading facilities relevant to the Programme, and (iii) any other installed items ; (f ) removal and disposal methods stating — (i) the removal and disposal option, describing the removal method and the disposal route, recognising any potential trans-frontier shipment of wastes, considering that installations and structure on land, except for buried transportation pipelines and gathering lines, shall be completely removed and the environment restored to its original condition, (ii) an indication of how the principles of the waste hierarchy will be met as well as complying with waste regulations, the extent to which the installation or any part of it, including the topsides and the materials
RegulationsPDF20232023-067