Afrindustria/ Gas Gap Monitor

Library / Midstream and Downstream Oil & Gas Industry Service Permit - MDOGISP

Midstream and Downstream Oil & Gas Industry Service Permit - MDOGISP

Page 16 of 61

Open the PDF at page 16

  
  
This is a property of the Nigerian Midstream and Downstream Petroleum Regulatory Authority. All rights reserved.  
11  
  
Applicable to:  
  
−  All Midstream and Downstream Petroleum 
Operators   
 
−  All Service Companies  
GUIDELINES FOR MIDSTREAM AND DOWNSTREAM OIL AND GAS  
INDUSTRY SERVICE PERMIT (MDOGISP) OPERATIONS  
Code: NMDPRA Guide 1001 - 2023  
Effective  Date: 15th June 2023  
a. Notwithstanding the issuance of a permit, the accreditation of the following facilities 
used for the following permits are mandatory.  
i.  
Safety training centres ii. 
 
Lab services  
 
iii. 
Waste management Services  
b. Such accreditation must be carried out prior to the use of those facilities for operations.  
c. Accreditation certificate or Operational approval shall be issued for such service.  
d. Failure to carry out the above shall attract sanctions.   
3.4 
Issuance and Validity of Permits  
The following applies:  
i. 
Permits shall be issued upon satisfactory outcome of Desktop review and inspections as 
may be applicable.   
ii. 
All permits issued pursuant to these Guidelines shall expire on the anniversary of the date 
of issue as reflected on the permit.   
iii. 
Permit(s) issued by the NMDPRA with respect to MDOGISP can be viewed online in line 
with Section 2.5 of the Guidelines or may be printed by the Service Provider from its 
MDOGISP profile. iv. Any modification or subsequent change(s) on any issued permit 
shall require a new application.  
v. Notwithstanding the issuance of service permit by NMDPRA, to a prospective Service 
Provider, the Licensee/Operator is expected to independently evaluate the Service Providers 
for the intended service prior to engagement.  vi. The NMDPRA shall not be liable or requested 
to provide indemnity for failure of a service provider for deliver on services for permit issued 
NMDPRA.    
3.5 
Renewal of MDOGISP   
The following shall apply:  
i.  
All permits shall be renewed on expiry.  ii.  Renewal of applications shall be open 
four (4) weeks before expiration of the permit.