Library / B 799 Federal Republic of Nigeria Official Gazette No. 107
B 799 Federal Republic of Nigeria Official Gazette No. 107
Page 22 of 24
B 820 SECOND SCHEDULE Regulations 35 ADMINISTRATIVE PENALTIES The administrative penalties, referred to in ERegulation 35 of these Regulations, are — A — ENVIRONMENTAL PERMIT 1. Failure to register a point source B — ENVIRONMENTAL STUDIES 1. Failure to conduct requisite or statutory environmental study 2. Altering Environmental Status prior to requisite Environmental Studies 3. Commencing field data gathering without approved Scope of Work 4. Commencing construction without requisite environmental study approval 5. Failure to submit Biological Monitoring report within six months of the final field data gathering C — WASTE MANAGEMENT 1. Noncompliance with submission of Waste Release Inventory Consignment Notes and Manifest 2. Unauthorised discharge or disposal of wastes 3. Use of containers not fit for purpose in waste collection, storage and transportation 4. Unauthorised storage of waste within and outside operational areas 5. Failure to conduct Environmental Compliance Monitoring 6. Failure to submit Environmental Compliance Monitoring 7. Conduct of Environmental Compliance Monitoring without the participation of the Authority 250.00/point 65,000/point/ source/day 100,000.00 5,000,000.00 50,000.00 5,000,000.00 25,000.00 2,500,000.00 100,000.00 5,000,000.00 25,000.00 2,500,000.00 10,000/ month 1,000,000/ month 200,000.00 5,000,000.00 20,000.00 2,500,000.00 50,000.00 5,000,000.00 10,000.00 1,000,000.00 10,000.00 1,000,000.00 10,000.00 1,000,000.00 No. Penalties Midstream Downstream Petroleum Petroleum Operations Operations USD NGN
RegulationsPDF20232023-0622