Library / Midstream and Downstream Petroleum Operations Regulations 2025
Midstream and Downstream Petroleum Operations Regulations 2025
Page 20 of 82
B 2122 22.—(1) The Authority shall verify declarations relating to a vessel in which petroleum liquids or natural gas or its derivatives for shipment is to be carried. (2) The Authority shall certify the measurements systems and volumes of petroleum liquids or natural gas or its derivatives discharged or loaded into a vessel designated and approved for that purpose, at the port of loading or discharge. 23. A vessel carrying petroleum liquids or natural gas or its derivatives, shall not carry part cargo or dead freight, except — (a) with the prior authorisation of the Authority; (b) within the limits of operational practice; or (c) where such vessel is loading full complement from two or more terminals within Nigeria. 24. A vessel in which petroleum liquids or natural gas or its derivatives is carried, shall not depart from Nigeria or its territorial waters from where cargo operations are conducted without — (a) complete documentation in the prescribed manner by the appropriate authorities; and (b) specific authorisation by the Authority and any other agency having authority in that regard. 25.—(1) A vessel in which petroleum liquids or natural gas or its derivatives is carried, shall not make, demand or receive any topping within or outside any loading port or terminal in Nigeria. (2) Petroleum liquids or natural gas or its derivatives shall not be loaded into a ballast tank or any other tank, container or receptacle of a vessel other than those designated, dedicated and designed for its storage and transportation. 26. The loading, discharge or trans-shipment of petroleum liquids or natural gas or its derivatives, shall not be carried out at any location within Nigeria or its territorial waters, except at the point authorised or designated by the Authority for that purpose. 27. A vessel utilised for fast support intervention, platform supply or support, offshore supply, anchor handling (tug supply or towing supply), dive support, jackup barge, multipurpose support, or field installation in midstream and downstream petroleum operations shall obtain a coastal vessel licence from the Authority. Verification and certification by the Authority, etc. Restriction on vessel from carrying part cargo or dead freight Restriction on vessel not to depart without full documentation Prohibition of topping and loading into ballast tank Prohibition of loading, discharge, importation, or transship- ment in an unauthorised location Duty to obtain a coastal vessel licence
RegulationsPDF20252025-1220