Library / Midstream and Downstream Petroleum Operations Regulations 2025
Midstream and Downstream Petroleum Operations Regulations 2025
Page 31 of 82
B 2133 (2) A permit to operate a pipeline shall be renewed annually for the duration of the petroleum pipeline licence upon the — (a) submission of an application in the manner prescribed by the Authority; and (b) payment of prescribed fees. PART V — HYDROCARBON REFINING AND PROCESSING FACILITIES 49. The design and construction of a hydrocarbon refining or processing facility shall be in accordance with the standards and recommended practices approved by the Authority. 50. The engineering design of a hydrocarbon refining or processing facility shall be subjected to technical and safety studies or reviews and the Authority, licensee and an independent assessor appointed by the licensee shall jointly participate in the study or review. 51. The optimisation or modification of the design of a hydrocarbon refining or processing shall not be undertaken without the prior authorisation of the Authority. 52.—(1) The Authority may, prior to the commencement of fabrication of major equipment and critical systems of a hydrocarbon refining or processing facility, conduct an inspection of the fabrication yard. (2) Notwithstanding subregulation (1) of this regulation, the Authority shall participate in the conduct of dimensional checks and functionality assessment of major equipment and critical systems of a hydrocarbon refining or processing facility. 53.—(1) The sparing philosophy of major equipment and critical systems of a hydrocarbon refining or processing facility shall be approved by the Authority. (2) The sparing philosophy shall provide for redundancies, ease of maintenance and continuous operation. 54. Prior to pre-commissioning and commissioning of hydrocarbon refining or processing facilities, the Authority shall verify the extent of mechanical completion and subject the facilities to pre-start-up safety audit and pre- commissioning checks. 55. An application to introduce hydrocarbon or commission a hydrocarbon refining or processing facility shall be accompanied by — (a) payment of the prescribed fees and service charge; Standards for design, construction and inspection of hydrocarbon refining and processing facilities Engineering and technical studies or review Design optimisation or modification Fabrication and inspection Sparing philosophy Pre- commissioning and readiness for start-up Requirements for commissioning
RegulationsPDF20252025-1231