Afrindustria/ Gas Gap Monitor

Library / Midstream and Downstream Petroleum Operations Regulations 2025

Midstream and Downstream Petroleum Operations Regulations 2025

Page 80 of 82

Open the PDF at page 80

B  2182
113.
Petroleum product diversion by jerrycan.
114.
Operating a retail outlet without adequate company
identification.
115.
Petroleum product adulteration at a retail outlet.
116.
Failure to comply with minimum industry safety training
requirements for staff in facility operations, truck drivers and
motor boys.
117.
Decanting and unauthorised peddling of petroleum products.
118
Petroleum product adulteration or trans-loading in depots,
retail outlets or while the vehicle is in transit.
119.
Importation or discharge of off-spec petroleum products.
120.
Failure to display price billboard.
121.
Poor housekeeping of retail outlet facilities.
122.
Indiscriminate parking of vehicles and trucks within a facility.
123.
Pump under-dispensing from retail outlets and Autogas
add-ons.
124.
Repair of vehicles within retail outlets and refilling plants.
125.
Failure to produce, upon demand, storage and sales
inventories and reports of a midstream or downstream facility.
126.
Establishment of retail outlets and CNG facility without LTE.
127.
Construction of retail outlets and CNG facility without LTC.
128.
Operation of retail outlets and CNG facility without LTO.
129.
Failure to conduct pressure test before tank burial.
130.
Hoarding of petroleum products.
131.
Late renewal of retail outlets and CNG facility licence beyond
31st March of every year.
132.
Late renewal of depot and terminal licence beyond 31st March
of every year.
133.
Non-display of a licence at a retail outlet.
134.
Unauthorised tank conversion at a retail outlet.
125% of dispensing cost
per litre.
NGN100,000
125% of dispensing cost
per litre
NGN2,000,000
NGN500 per litre or its
equivalent in metric tonnes
or 125% of dispensing cost
per litre (whichever is
higher)
NGN10,000,000
USD2,000,000
NGN50,000
NGN50,000
NGN50,000
NGN250,000 per dispensing
nozzle and put pump out of
use until corrected.
NGN500,000
NGN1,000,000.
NGN1,000,000.
NGN10,000,000 or confis-
cation of the facility.
NGN2,000,000.
NGN100,000.00
NGN1,000,000.00.
NGN100,000.00.
NGN1,000,000.
NGN50,000
NGN500,000