Library / B 133 Federal Republic of Nigeria Official Gazette No. 51
B 133 Federal Republic of Nigeria Official Gazette No. 51
Page 10 of 11
B 142 (g) historical flare gas data per flare stack ; (h) flared gas composition by stack ; and (i) any other data that may be required by the Authority ; “gas flaring” means burning or incineration of gas from a flare stack ; “major flaring event” means major combustion in the flare system or incinerator in a midstream petroleum operation resulting from but not limited to blow down for maintenance, facility start-up and shutdown, testing, or deliberate burning outside the operating or set parameters ; “mal-operation” means operation of facility or equipment outside its operating parameters resulting in faulty or abnormal operation ; “Metering and Data Collection Standards” means flare gas Metering and Data Collection Standards and requirements issued by the Authority ; “NGN” means Nigerian Naira ; “permit holder” means a person that has been granted a permit to access flare gas by the Authority ; “permit to access flare gas” means a permission granted to a permit holder by the Authority to take flare gas at a flare point ; “planned maintenance” means prescribed maintenance either routine or stipulated ; “safety flaring” means flaring undertaken to ensure safe operations at a facility ; “start-up” means the act of starting a process, an equipment, system or a plant or facility ; “strategic operational reason” means consideration to certain operations but not limited to relieving devices, blow down, facility start up and testing ; “testing” means the act of examining or validating the integrity of an equipment, system or a facility during operation ; “venting” means releasing of hydrocarbon or substance into the atmosphere from midstream gas processing facilities. 19. These Regulations may be cited as the Midstream Gas Flare Regulations, 2023. Citation
RegulationsPDF20232023-0310