Afrindustria/ Gas Gap Monitor

Library / NMDPRA DAILY PMS TRUCKOUT REPORT FOR 2ND JUNE, 2023

NMDPRA DAILY PMS TRUCKOUT REPORT FOR 2ND JUNE, 2023

Page 3 of 3

Open the PDF at page 3

TABLE 3
NIGERIAN MIDSTREAM AND DOWNSTREAM PETROLEUM REGULATORY AUTHORITY (NMDPRA)
DEPOT 
NO OF TRUCKS
VOL. IN LTRS
STATE
NO OF TRUCKS
VOL. IN LTRS
SE
ABA
5
255,000
Abia
1
45,000
NE
ENUGU
21
1,028,000
Adamawa
21
1,025,999
SS
GOMBE
5
240,000
Akwa Ibom
0
0
SE
GUSAU
29
1,339,000
Anambra
10
533,000
NE
JOS
15
664,984
Bauchi
17
833,992
SS
KADUNA DEPOT
23
1,087,988
Bayelsa
0
0
NC
KANO
94
4,497,974
Benue
12
532,000
NE
MAIDUGURI
14
691,994
Borno
10
489,989
SS
MAKURDI
22
968,000
Cross River
1
45,000
SS
MINNA
12
585,000
Delta
3
135,000
SE
PPMC BENIN
8
355,000
Ebonyi
4
180,000
SS
PPMC IBADAN
6
217,000
Edo
8
355,000
SW
PPMC ILORIN
12
496,000
Ekiti
2
90,000
SE
PPMC MOSIMI
8
322,003
Enugu
6
270,000
NC
PPMC ORE
5
213,000
FCT
66
3,221,003
NE
PPMC WARRI
3
135,000
Gombe
2
90,000
SE
SULEJA
99
4,747,004
Imo
3
165,000
NW
YOLA
25
1,231,999
Jigawa
13
640,991
NW
Kaduna
19
902,989
NW
Kano
37
1,763,003
NW
Katsina
31
1,434,980
NW
Kebbi
14
663,000
NC
Kogi
10
460,000
NC
Kwara
12
496,000
SW
Lagos
0
0
NC
Nasarawa
23
1,017,000
NC
Niger
23
1,100,001
SW
Ogun
8
322,003
SW
Ondo
3
123,000
SW
Osun
6
217,000
SW
Oyo
9
404,991
NC
Plateau
0
0
SS
Rivers
0
0
NW
Sokoto
11
511,000
NE
Taraba
4
206,000
NE
Yobe
12
577,005
NW
Zamfara
5
225,000
TOTAL
406
19,074,946
406
19,074,946
NOTE: DUE TO NETWORK GLITCH, SULEJA DEPOT IS YET TO FULLY UPLOAD PMS BRIDGING RECEIPT
TABLE 4
NIGERIAN MIDSTREAM AND DOWNSTREAM PETROLEUM REGULATORY AUTHORITY (NMDPRA)
DEPOT
NO OF TRUCKS
VOL. IN LTRS
STATE
NO OF TRUCKS
VOL. IN LTRS
TOTAL
0
0
0
0
TABLE 5
NIGERIAN MIDSTREAM AND DOWNSTREAM PETROLEUM REGULATORY AUTHORITY (NMDPRA)
DEPOT
NO OF TRUCKS
VOL. IN LTRS
STATE
NO OF TRUCKS VOL. IN LTRS
TOTAL
0
0
0
0
DAILY DEPOT LOADING ANALYSIS
STATE DISTRIBUTION OF DAILY DEPOT LOADING
DECANTED PRODUCTS REPORT FOR   JUNE, 2023. (PMS)
DEPOT  DECANTING  ANALYSIS
STATE DISTRIBUTION OF DEPOT DECANTING
DEPOT LOADING OF THE DECANTED PRODUCTS FOR   JUNE, 2023. (PMS)(LOCAL LOADING)
BRIDGING RECEIPT REPORT FOR 2ND JUNE 2023. (PMS)
DEPOT BRIDGING RECEIPT ANALYSIS
STATE DISTRIBUTION OF  BRIDGING RECEIPT