Library / Extraordinary Federal Republic of Nigeria Official Gazette No. 33
Extraordinary Federal Republic of Nigeria Official Gazette No. 33
Page 5 of 17
Duty to provide information. Measurement standards. (7) ensure that a contractor or sub-contractor engaged in metering activities is registered with the Authority, and issued with an appropriate permit: (g) ensure that metering and allocation systems are designed, fabricated, inspected, tested. and installed in accordance with these Regulations and guidelines issued by the Authority : (/) ensure that measurement systems report, records and data are maintained as prescribed by the Authority for audit ; and (/) ensure that its measurement operations are undertaken with valid and appropriate licences. permits or authorisations. (2) Where a licensee or permit holder fails to install or operate measurement system at appropriate point, the Authority shall licence a third party to install or operate a measurement system, and the licensee or permit holder who has failed to install or operate the measurement system shall be responsible for the costs incurred by the third party to install such measurement system. 4.—(!) A licensee or permit holder shall provide the Auchority with information or data on — (a) annual performance of measurement system ; (b) annual maintenance plan and record for previous year : (c) malfunction of measurement system : (¢) annual recertification notice ; (e) annual totalizer measurement : (7) annual actual measurement ; (g) report of maintenance work on flow computer and other metering system components ; (4) petroleum liquids and natural gas handling agreements, including cargo loss claim ; and (i) the performance of a newly installed metering system not later than three months after installation. (2) The Authority may direct a person to provide information or data on any measurement operation and such person shal! provide the information or data in the prescribed manner within the time frame stipulated in such directive. Parr I — Measurement STANDARDS AND METHODS 5. The Authority shall approve standards and recommended practices to be used in the design, construction, modification, upgrade, operation, and maintenance of a measurement system.
RegulationsPDF20232023-025