Library / Extraordinary Federal Republic of Nigeria Official Gazette No. 33
Extraordinary Federal Republic of Nigeria Official Gazette No. 33
Page 8 of 17
(4) Measurement systems used for natural gas or its derivatives, crude oil or its derivatives, condensate, petroleum liquids, petroleum products, or any other form of petroleum liquids shall not be approved for shipment into Nigeria, without meeting the following minimum conditions— (a) meters are tested and calibrated : (b) critical equipment are inspected and tested ; (c) sampling devices are tested and calibrated ; and (d) proving systems are inspected, tested and calibrated. (5) Measurement systems used for natural gas or its derivatives, crude oil or its derivatives, condensate, petroleum liquids, petroleum products, or any other form of petroleum liquids installed in a vessel shall not be approved for sailing into Nigeria, without meeting the following minimum conditions — (a) meters are tested and calibrated ; (b) critical equipment are inspected and tested ; (c) sampling devices are tested and calibrated ; (d) cargo tanks are inspected and calibrated ; and (e) proving systems are inspected, tested and calibrated. (6) The Authority shall be present when an equipment or appliance for measuring or weighing natural gas or its derivatives, crude oil or its derivatives, condensate. petroleum liquids, petroleum products or any other form of petroleum liquids is being calibrated, recalibrated, tested, compared, measured or weighed against a standard approved by the Authority. (7) Where a licensee or permit holder fails to test or recertify a measurement system, the Authority may, in addition to any penalty under these regulations, direct a third party to test and recertify such measurement system and the licensee or permit holder who has failed to test or recertify the measurement system shall be responsible for the costs incurred by the third party directed by the Authority to carry out the test or recertification. 13.—(1) A licensee or permit holder shall not operate a measurement system without the authorisation of the Authority. (2) A licensee or permit holder shall not commence the maintenance of a measurement system without the approval of the Authority. (3) A licensee or permit holder shall, in the course of operating a measurement system, keep performance records of metering system, sampling system, proving system, dispensing system, flow computing system, and static measurement system in accordance with the requirements and conditions prescribed by the Authority. (4) A licensee or permit holder shall not delete the records of any measurement system without the prior approval of the Authority. B 27 Operation and maintenance of measurement system,
RegulationsPDF20232023-028