Library / Applicable to all Oil & Gas Operators PROCEDURE GUIDE FOR THE GRANT OF PERMIT/APPROVAL/LICENSE FOR LUBE OIL BLENDING/WASTE OIL RECYCLING PLANT Code: DPR Guide 0021 - 2020
Applicable to all Oil & Gas Operators PROCEDURE GUIDE FOR THE GRANT OF PERMIT/APPROVAL/LICENSE FOR LUBE OIL BLENDING/WASTE OIL RECYCLING PLANT Code: DPR Guide 0021 - 2020
Page 14 of 24
Applicable to all Oil & Gas Operators PROCEDURE GUIDE FOR THE GRANT OF PERMIT/APPROVAL/LICENSE FOR LUBE OIL BLENDING/WASTE OIL RECYCLING PLANT Code: DPR Guide 0021 - 2020 Revision Date: 2nd October 2020 This is a property of the Department of Petroleum Resources. All rights reserved 10 is also concrete; drainage of the enclosure shall be evacuated by means of a pipe fitted with a valve, to be kept close when not in use, and which is capable of being activated from outside the enclosure. 5. The quality of the effluent generated from the drainage system in the plant shall be monitored at such intervals as specified in the existing Environmental Guidelines issued by the Department and reports of analysis submitted to the Director/CEO, Department of Petroleum Resources on monthly basis. 6. All other precautions and provisions of up-to-date equipment for preventing pollution as specified in the Department’s environmental guidelines shall be put in place to the satisfaction of the Director, Petroleum Resources. 4.2 General Safety 1. All offices, warehouses and process buildings shall be constructed with utmost consideration for the safety of the workers and equipment. Laboratory building construction shall take into consideration the safety of personnel and provision of adequate ventilation as well as that for proper disposal of waste. 2. Material Safety Sheet (MSS) shall be prepared in respect of all potentially hazardous chemicals and materials. 3. Emergency alarm system and evacuation programs shall conform to Standards Industry Practice to the satisfaction of the Department. 4. The noise level at any point in the plant shall not exceed 90dBA. Where this level is to be exceeded, wearing of ear protection device shall become mandatory. 5. The automatic control system for emergency shutdown of all strategic or critical equipment in the plant such as column, fired heaters, pipeline and pump discharge headers shall be based on fail-safe logic designs. 6. Fire sensors and alarm system shall be installed at strategic points of the plant and its offsite facilities. In addition, adequate fire mitigation systems shall be
CodesPDF20202020-1014