Library / Applicable to all Oil & Gas Operators PROCEDURE GUIDE FOR THE GRANT OF PERMIT/APPROVAL/LICENSE FOR LUBE OIL BLENDING/WASTE OIL RECYCLING PLANT Code: DPR Guide 0021 - 2020
Applicable to all Oil & Gas Operators PROCEDURE GUIDE FOR THE GRANT OF PERMIT/APPROVAL/LICENSE FOR LUBE OIL BLENDING/WASTE OIL RECYCLING PLANT Code: DPR Guide 0021 - 2020
Page 15 of 24
Applicable to all Oil & Gas Operators PROCEDURE GUIDE FOR THE GRANT OF PERMIT/APPROVAL/LICENSE FOR LUBE OIL BLENDING/WASTE OIL RECYCLING PLANT Code: DPR Guide 0021 - 2020 Revision Date: 2nd October 2020 This is a property of the Department of Petroleum Resources. All rights reserved 11 provided at all identified fire risk areas of the plant. 4.3 Firefighting and Protection Measures 1. In every building, oil blending or recycling plant, they shall be provided and kept in readiness to the satisfaction and approval of the Chief Federal/State Fire Officer, adequate equipment for firefighting and protection. 2. Each item of firefighting equipment shall be inspected and tested at appropriate intervals by a Competent Person appointed for the purpose by the licensee. The date of the last inspection shall be entered in a logbook kept for that purpose. 3. All the personnel employed in the installation shall be trained on the use of firefighting equipment. 4. Instruction to personnel in case of fire shall be clearly and concisely expressed in writing and prominently displayed at the site. 5. “NO SMOKING” and other safety signage shall be conspicuously displayed at strategic locations in the plant and be illuminated for ease of identification in dull brightness. 6. Whenever a fire or any accident occurs in the installation, a report of the circumstances and probable causes shall be forwarded to the nearest office of the Department by the licensee within forty-eight hours of occurrence. 7. Automatic fail-safe emergency alarm devices shall be incorporated in the critical sections of the plant. 4.4 Hazard and Operability Review (HAZOP) Petroleum Plants designs shall be subjected to Engineering and HAZOP reviews at the design and development stages prior to the completion of the detailed engineering design and specifications. Accredited representatives of the department shall be present at the HAZOP reviews.
CodesPDF20202020-1015