Library / Applicable to all Oil & Gas Operators PROCEDURE GUIDE FOR THE GRANT OF PERMIT/APPROVAL/LICENSE FOR LUBE OIL BLENDING/WASTE OIL RECYCLING PLANT Code: DPR Guide 0021 - 2020
Applicable to all Oil & Gas Operators PROCEDURE GUIDE FOR THE GRANT OF PERMIT/APPROVAL/LICENSE FOR LUBE OIL BLENDING/WASTE OIL RECYCLING PLANT Code: DPR Guide 0021 - 2020
Page 17 of 24
Applicable to all Oil & Gas Operators PROCEDURE GUIDE FOR THE GRANT OF PERMIT/APPROVAL/LICENSE FOR LUBE OIL BLENDING/WASTE OIL RECYCLING PLANT Code: DPR Guide 0021 - 2020 Revision Date: 2nd October 2020 This is a property of the Department of Petroleum Resources. All rights reserved 13 6. PLANT OPERATION 1. The plant shall be operated in compliance with the provisions of the Petroleum Refining Regulations, 1974 and its subsequent revisions. 2. The operator of blending plants shall prepare and submit an annual program of activity in the form of a presentation to the Director/CEO, Department of Petroleum Resources at the beginning of each calendar year. 3. The plant owner shall prepare and submit planned and actual production profile on quarterly basis. 7. PLANT MAINTENANCE This comprises routine preventive scheduled and turn-around maintenance. Preventive maintenance schedules on critical equipment shall be prepared and submitted to the Department of Petroleum Resources for monitoring purposes. The plant facilities shall be periodically examined for corrosion detection and corrosion protection systems and devices installed shall be checked regularly to ensure effective performance. All these anti- corrosion performance monitoring shall be carried out in accordance with current NACE (National Association of Corrosion Engineers) Standards and procedures. All turn-around maintenance (TAM) scheduled shall be duly submitted to the Director/CEO, Department of Petroleum Resources at least three months prior to its commencement for statutory oversight and thereafter, monthly progress report of the maintenance shall be rendered until completion, for monitoring purposes. 8. PLANT MODIFICATION Any proposed modification or enlargement of existing plant and facilities shall be communicated to the Director/CEO, Department of Petroleum Resources and must be subjected to the provisions of Section 2.3 of this Guideline and approved before being carried out.
CodesPDF20202020-1017