Library / Applicable to all Oil & Gas Operators PROCEDURE GUIDE FOR THE GRANT OF PERMIT/APPROVAL/LICENSE FOR LUBE OIL BLENDING/WASTE OIL RECYCLING PLANT Code: DPR Guide 0021 - 2020
Applicable to all Oil & Gas Operators PROCEDURE GUIDE FOR THE GRANT OF PERMIT/APPROVAL/LICENSE FOR LUBE OIL BLENDING/WASTE OIL RECYCLING PLANT Code: DPR Guide 0021 - 2020
Page 22 of 24
Applicable to all Oil & Gas Operators PROCEDURE GUIDE FOR THE GRANT OF PERMIT/APPROVAL/LICENSE FOR LUBE OIL BLENDING/WASTE OIL RECYCLING PLANT Code: DPR Guide 0021 - 2020 Revision Date: 2nd October 2020 This is a property of the Department of Petroleum Resources. All rights reserved 18 13. FEES The following fees shall be payable: Fee (N) Lube Blending Plant Processing Fee Site Suitability Approval 250,000 Permit to Establish 250,000 Approval to Construct 250,000 Revalidation of ATC 250,000 License to Operate 250,000 Approval to Modify 300,000 Lube blending Plant Statutory License Fee N2,000 per 20,000 litres or part thereof of base oil storage Capacity. Base Oil Off-Take License Application Fee 100, 000.00 for every 1,000,000 litres Processing Fee 200,000.00 per application 14. OFFENCES Any person that contravenes any provision of these Procedure Guide shall be liable to a fine as listed below: Offence Fine (N) a. Construction of Plant without ATC- Penalty 3,000,000 b. Operating a Lube Blending Plant without License (Annually)-Penalty 1,500,000 c. Construction of Plant without PTE- Penalty 1,000,000 d. Plant Modification without Approval -Penalty 3,000,000 e. Late Renewal of LTO beyond Q1 100,000 f. Non-Renewal Processing Fee 500,000 g. Procurement of Critical equipment without Test 5,000,000
CodesPDF20202020-1022