Applicable to all Oil & Gas Operators  
PROCEDURE GUIDE FOR THE GRANT OF PERMIT/APPROVAL/LICENSE FOR 
LUBE OIL BLENDING/WASTE OIL RECYCLING PLANT 
Code: DPR Guide 0021 - 2020 
 
Revision Date: 2nd October 2020 
 
 
 
This is a property of the Department of Petroleum Resources. All rights reserved  
 
4 
tanks) of the Plant. 
c. Electrical Drawings of the Plant. 
d. Process Design Drawings which should include Process Flow 
Diagrams (PFD) and Piping and Instrumentation Diagrams (P&ID) for 
the Plant. 
e. Utility Flow Diagram (UFD) for the Plant. 
f. Safety and Fire Fighting Diagram for the Plant. 
vii. 
Codes, Standards and Specifications adopted in the design of the plant 
with specifications of equipment and facilities to be installed. 
viii. 
A Report signed by the Chief Federal/State Fire officer, or an officer 
authorized by him in that behalf, that he is satisfied with the proposed 
arrangements for the prevention and containment of fire. 
ix. 
DPR approved Environmental Impact Assessment (EIA) Study for the 
project. 
x. 
A project execution schedule for the installation/construction stage of the 
project. 
Upon a satisfactory appraisal of the above submission, the company shall be invited to 
make a Technical Presentation to the Department on the project. 
An Approval to Construct (ATC) the lube oil/recycling plant shall be granted by the 
Department if satisfactory. 
2.3.1 
Validity of Approval to Construct 
The validity of an approval to construct the blending/waste recycling plant shall be for a 
period of twelve (12) months. It is expected that at least 50% mechanical erection would 
have been achieved. Otherwise, a revalidation of the Approval to Construct will be 
necessary.