Library / © 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
© 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
Page 101 of 114
100 | P a g e Each of the components in the calibrated gases (WGM) used for either acceptance tests, commissioning or during operation shall have the following documented uncertainty limits (extended uncertainty with a coverage factor k=2): Component range (mole %) Uncertainty (%) 0.1 – 0.25 5.00 0.25 - 1 1.00 1 - 10 0.5 10 - 100 0.2 1 1.20.8 Performance 1.20.8.1 Uncertainty and repeatability The repeatability of the OGC shall be within the following limits: Component range (mole %) Standard deviation (mole %) 0 - 25 0.02 25 - 100 0.05 Control procedure shall be worked out for the witnessing and approval by the Department of Petroleum Resources of the metering system, and its functional acceptance test before leaving the factory and on the completion of installation on site before commissioning. This shall follow the lodgement of construction and installation Program with the Department of Petroleum Resources.
GuidelinesPDF101