100 | P a g e 
 
 
Each of the components in the calibrated gases (WGM) used for either acceptance 
tests, commissioning or during operation shall have the following documented 
uncertainty limits (extended uncertainty with a coverage factor k=2): 
 
 
 
 
 
 
 
 
 
 
Component range 
(mole %) 
Uncertainty 
(%) 
 
 
0.1 – 0.25 
5.00 
 
 
0.25 - 1 
1.00 
 
 
1 - 10 
0.5 
 
 
10 - 100 
0.2 
 
 
 
 
 
 
 
 
 
1
1.20.8 Performance 
 
 
1.20.8.1 Uncertainty and repeatability 
The repeatability of the OGC shall be within the following limits: 
 
 
Component range (mole %) 
Standard 
deviation 
(mole %) 
0 - 25 
0.02 
 
25 - 100 
0.05 
 
 
 
 
 
 
 
 
 
 
 
Control procedure shall be worked out for the witnessing and approval by the Department 
of Petroleum Resources of the metering system, and its functional acceptance test before 
leaving the factory and on the completion of installation on site before commissioning. This 
shall follow the lodgement of construction and installation Program with the Department 
of Petroleum Resources.