103 | P a g e payment of fine of $10,000. (Ten Thousand USD) 4. Conducting inspection FAT/SAT of any critical equipment without approval and without witnessing by Representative of the Department. Per equipment $50,000. (Fifty Thousand USD) 5. Modification, Alteration, upgrade, etc. of LACT Metering System (Export) without DPR approval. Per LACT System $250,000. (Two Hundred and Fifty Thousand USD) 6. Modification, Repair, Alteration of surface or underground storage tanks without approval. Introduction of dead woods, capillary Tube or false- bottom, etc. attract the same fine. Per storage greater than or equal to 500 barrels. $25,000. (Twenty-Five Thousand USD) for crude oil tanks 7. Non-compliance in ensuring DPR Representatives witness out turn verification at the port of discharge. Per loaded Vessel or shipment $50,000. (Fifty Thousand USD) 8. Tampering or Bye-pass of pipeline, back-loading line (depots), lines for export at terminal or discharge at Jetties/Depots, etc. without approval. Per loading or shipment $200,000. (Two Hundred Thousand USD) 9. Exporting/Importing Petroleum or Petroleum Products without approval. Per loading or shipment Outright forfeiture and payment of total cost in USD to DPR 10. For any Petroleum or Petroleum Product handling facility, the set-back shall not be less than 25km from any border country and lack of adherence or the construction of the facility by operator or owner without approval by DPR, shall attract sanctions, thus: Per facility Forfeiture of petroleum product and DPR shall report to Security Agency, Town Planning Authority for outright demolition.
GuidelinesPDF104