Library / © 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
© 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
Page 105 of 114
104 | P a g e 11. Failure to apply the DPR Methodology for Determination and Allocation of crude Oil Losses. Per facility Monetary equivalent of 30% of the total loss volume allocated at the prevailing oil price in USD 12. National Production Monitoring System (NPMS) non-compliance by operating company. Per Week Per Month Per Quarter $10,000. (Ten Thousand USD) $30,000. (Thirty Thousand USD) $100,000. (One Hundred Thousand USD) 13. Late submission of export permit application. Deadline Definition: Tenth (10th) day of the second month of the previous quarter of the same year. Per quarter $1,000. (One Thousand USD) 14. Non-compliance with applying approved new base volume and meter factor from proving. Per loading $250,000. (Two Hundred and Fifty Thousand USD) 15. Non-compliance with installation/tampering with DPR Locking Device (sea line Valves) on export pipeline. Per Terminal $100,000. (One Hundred Thousand USD) 16. Tampering with Metering Systems or its ancillary equipment without approval. Per Meter $100,000. (One Hundred Thousand USD) 17. Commissioning any critical equipment or facility e.g. valve, compressor, pump, sampler, etc. without approval. Per equipment $50,000. (Fifty Thousand USD) 18. None display on operational tank in service “Tank Service”, “Date of Calibration” and “Next Due Date of Calibration. Per tank in service or operation $100,000. (One Hundred Thousand USD) Per Tank
GuidelinesPDF105