Library / © 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
© 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
Page 107 of 114
106 | P a g e prevailing market price in USD to the DPR 25. Lack of proper accounting, reporting, intentional/wrongful allocation of losses to any injector, equity holder or stakeholder. Per barrel Refund of allocated volume to rightful owner and payment of equivalent of 30% of total volume involved to the DPR at prevailing prices in USD. 26. Introduction of hydrocarbon, Comingling/Spiking without approval from the Director, Petroleum Resources. Operation or for every violation $100,000. (One Hundred Thousand USD) 27. Decommissioning of facility without approval from the Director, Petroleum Resources. Per Action $50.000 (Fifty Thousand USD) 28. All “Agreement” between companies, operators, and injectors in any form shall be carried out in line with the Petroleum Acts and a copy submitted to the Department. Per Company Appropriate Sanction may be imposed by Director, as may be applicable. 29. Tampering or breakage of security seal on flow meters used for custody transfer without approval. Per Flow Meter $5,000 (Five Thousand USD) 30. Non- Compliance with frequency of calibration of measurement dipping tape, UTI, Temperature/Pressure Gauges & Transmitters. Per Equipment $5,000 (Five Thousand USD) 31. Collection of crude oil samples without DPR approval. Per Litre $500 (Five Hundred USD) 32. For all DPR approved flow meters, flow rate shall be maintained at specified station flow range. Per Failure of station to inform DPR of changes in station flow rates $10,000 (Ten Thousand USD)
GuidelinesPDF107