107 | P a g e 33. Falsification of Proving System Calibration/Meter Proving reports. Per Prover/Meter $30,000 (Thirty Thousand USD) 34. Unavailability of up to date Metering station log book Per facility $5,000 (Five Thousand USD) 35. Modification, Alteration, upgrade, etc. of LACT Metering System at operator/Third Party Custody Transfer Point / Third-Party Injection Points without DPR Approval. Per LACT System $150,000. (One Hundred and Fifty Thousand USD) 36. False Declaration of Production Figures Per Barrel or part thereof $100 37. Submission of Production/Lifting Figures, Reports within 21 days First Week $10,000 Second Week and thereon $5,000 38. Failure to Calibrate/Recertify metering system Ancillary Equipment (Temperature & Pressure Gauges, Transmitters etc.) Per Equipment $5,000 39. Failure to calibrate FPSOs/FSO/Barges storage tanks as at when due. Per Vessel/Barge $200,000 40. Prover Loop Installation/Commissioning of Prover Loop without Approval $500,000 41. Failure to Recertify Prover Loop when due $175,000 Per Annum 42. Installation/Commissioning of Auto sampler without Approval $25,000 43. Failure to Recertify Auto sampler when due $25,000 Per Annum 44. Install/Commission of Meter(s) without Approval Per Meter $50,000 45. Failure to Recertify Meter(s) or carry out statutory meter proving when due Per Meter $20,000 per proving frequency in addition to Any other sanctions by the Department. 46. Installation/Commissioning of Storage Tank without Approval Per < 100,000 Bbls Tank $250,000 Per > 100,000 Bbls Tank $500,000 Note: 1- All fees in USD shall be paid to DPR in Naira equivalent based on the CBN prevailing rate at the time of infraction/application. 2- Payment of above-mentioned fines/fees shall be in addition to other necessary directives by the Director, DPR.
GuidelinesPDF108