Library / © 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
© 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
Page 16 of 114
15 | P a g e 1.2.4 The design and installation of the lock valve shall be approved and supervised by the Department of Petroleum Resources. After the installation of the lock valve has been found satisfactory by the Director of Petroleum Resources, all the keys to the lock shall be kept in the custody of the Department of Petroleum Resources Official – In – Charge of operations at the facility. 1.3 CLASSES OF MEASUREMENTS. 1.3.1 CLASS A MEASUREMENT The metering stations used for the delivery of petroleum to offshore customers and where sales contracts are applicable. The DPR officer(s) shall monitor and supervise the systems operations as applicable in the terminals for tax or royalty. The required overall measurement uncertainty shall be less than 1% on a volume basis for gas or as specified in the contract and approved by DPR. 1.3.2 CLASS B MEASUREMENT The metering stations for the delivery of petroleum in commonly used pipeline systems and where allocation procedures or joint operating contracts apply. This includes production metering for MER allocation. The DPR shall be furnished on a weekly basis the daily measurement record of the meter for accountability. The DPR officer(s) physical involvement in the system operations shall be intermittent, at least fortnightly. The required overall measurement uncertainty shall be less than 1.8% on a volume basis for gas or as specified in the contract. 1.3.3 CLASS C MEASUREMENT The metering stations for the delivery of fuel gas within the operator’s operating facility or to third party facility. The uncertainty limit shall be ± 2 % of standard volume. The DPR involvement is as in CLASS B. 1.4.4 CLASS D MEASUREMENT The Metering station for flare and injection gas measurement. The uncertainty limit shall be ±5% of standard volume. If the flare gas releases are due to the operational upset, blowdown, purging, or ESD operation the meter readings so recorded shall be forwarded within 24hours to the DPR nearest office with a detailed report on the scenarios of the releases. This report shall form the basis of zero charges on the flare gas releases while charges shall be sustained if the flare releases are operational philosophy. The DPR officer(s) involvement in the metering operations shall comply with CLASS B measurement systems. The uncertainty is given in standard volume, but other units may be requested (project specific) e.g. mass energy, etc. Note: Any other uncertainty limit may be applicable for fiscal measurement systems if validated by a cost-benefit analysis performed and accepted by the DPR. 1.5 UNCERTAINTY ANALYSIS An uncertainty analysis shall be developed for gas metering systems within 95% confidence level in accordance with recognized standards. The total gas metering system uncertainty shall, for the operating flow range, be below +/- 1.0% (mass metering). If a deviation on any of the equipment tolerances exists, it should be demonstrated that the metering system is within the limits for total uncertainty given in this section.
GuidelinesPDF16