2.3.4.2 Shall be used according to the equipment manufactures’ specification or as specified 
in API MPMS 3.1A and 17. 
2.3.5   Precautions to be Taken Prior to Commencement of Manual Gauging  
2.3.5.1 The petroleum or petroleum product’s surface in the tank shall be free of foam or 
waves due to agitation. 
2.3.5.2 The tape shall be rubbed with paste to give a good contrast (cut) between the 
portions wetted by petroleum or petroleum product from the remaining dry portion of the 
tape on withdrawal. 
2.3.5.3 The gauge hatch shall be free of any debris from the roof to the datum plate. 
2.3.5.4 To avoid static electricity hazards, it shall be ensured that the bob has contact with 
the gauge hatch before the bob touches the liquid level. The gauge shall be properly earthed 
before gauging. Also, gauging of a tank during a rain storm shall not be allowed. 
2.3.6 Manual Gauging Sequence 
2.3.6.1 The approved gauging procedure shall be by the innage method for floating and fixed 
roof storage tanks, and ullage method for special purpose vessels. The sequence to follow 
in carrying out the exercise shall be as outlined below: 
2.3.6.2 Innage Method 
2.3.6.2.1 The steel tape shall be gradually lowered through the dip hatch situated on the roof 
of the tank. 
2.3.6.2.2 The first dip is usually done for confirming reference height of storage tanks. If the 
reference height as checked does not agree with that stamped on the tank, then, other 
things shall be checked e.g. datum plate for debris/sediments, or if gauge hatch has an 
obstruction along the length. 
2.3.6.1.3 The tape is then reeled back on the pulley and the last mark where the petroleum 
or petroleum product wets the tape is read and taken as the tank dip. It is very essential that 
care be taken to avoid either the sagging of the tape or its deviation from the vertical plane 
as this could introduce appreciable errors into the gauge reading. The exercise is repeated 
until two consecutive identical gauges are obtained. Acceptable readings are illustrated as 
follows: 
Sequence 
Gauges Obtained 
Remarks 
 
1st Gauging 
1st Reading    
6m 400mm    
 
Not Acceptable 
2nd Reading 
6m 399mm 
3rd Reading 
6m 400mm 
 
2ndGauging 
1st Reading   
6m 399mm 
 
Acceptable 
2nd Reading 
6m 400mm 
3rd Reading 
6m 400mm 
 
3rd Gauging    
1st Reading 
6m 400mm 
 
Acceptable 
2nd Reading 
6m 400mm 
3rd Reading 
6m 399mm