Library / © 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
© 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
Page 20 of 114
19 | P a g e 2.3.4.2 Shall be used according to the equipment manufactures’ specification or as specified in API MPMS 3.1A and 17. 2.3.5 Precautions to be Taken Prior to Commencement of Manual Gauging 2.3.5.1 The petroleum or petroleum product’s surface in the tank shall be free of foam or waves due to agitation. 2.3.5.2 The tape shall be rubbed with paste to give a good contrast (cut) between the portions wetted by petroleum or petroleum product from the remaining dry portion of the tape on withdrawal. 2.3.5.3 The gauge hatch shall be free of any debris from the roof to the datum plate. 2.3.5.4 To avoid static electricity hazards, it shall be ensured that the bob has contact with the gauge hatch before the bob touches the liquid level. The gauge shall be properly earthed before gauging. Also, gauging of a tank during a rain storm shall not be allowed. 2.3.6 Manual Gauging Sequence 2.3.6.1 The approved gauging procedure shall be by the innage method for floating and fixed roof storage tanks, and ullage method for special purpose vessels. The sequence to follow in carrying out the exercise shall be as outlined below: 2.3.6.2 Innage Method 2.3.6.2.1 The steel tape shall be gradually lowered through the dip hatch situated on the roof of the tank. 2.3.6.2.2 The first dip is usually done for confirming reference height of storage tanks. If the reference height as checked does not agree with that stamped on the tank, then, other things shall be checked e.g. datum plate for debris/sediments, or if gauge hatch has an obstruction along the length. 2.3.6.1.3 The tape is then reeled back on the pulley and the last mark where the petroleum or petroleum product wets the tape is read and taken as the tank dip. It is very essential that care be taken to avoid either the sagging of the tape or its deviation from the vertical plane as this could introduce appreciable errors into the gauge reading. The exercise is repeated until two consecutive identical gauges are obtained. Acceptable readings are illustrated as follows: Sequence Gauges Obtained Remarks 1st Gauging 1st Reading 6m 400mm Not Acceptable 2nd Reading 6m 399mm 3rd Reading 6m 400mm 2ndGauging 1st Reading 6m 399mm Acceptable 2nd Reading 6m 400mm 3rd Reading 6m 400mm 3rd Gauging 1st Reading 6m 400mm Acceptable 2nd Reading 6m 400mm 3rd Reading 6m 399mm
GuidelinesPDF20