Afrindustria/ Gas Gap Monitor

Library / © 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE

© 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE

Page 26 of 114

Open the PDF at page 26

 
25 | P a g e 
 
 
2.5.5    Operation of Automatic Sampling System 
2.5.5.1 Before the commencement of loading, the desired frequency of sample grab shall be 
calculated for the batch in accordance with the procedure set out in ASTM D4177.  
Minimum sample frequency (bbl/grab) = 0.0001233D2 
D – nominal pipe diameter (mm) 
While No. of grabs for the parcel shall be deduced from the relationship 
No. of grabs =  
𝑷𝒂𝒓𝒄𝒆𝒍 𝑺𝒊𝒛𝒆
𝑴𝒊𝒏𝒊𝒎𝒖𝒎 𝑺𝒂𝒎𝒑𝒍𝒆 𝑭𝒓𝒆𝒒𝒖𝒆𝒏𝒄𝒚 
 
2.5.5.2 The sampler shall be allowed to operate continuously throughout the loading 
operation and shall not be removed until fluid flow has ceased in the pipeline after the 
shutdown of loading pumps, for production purposes the auto sampler or any suitable 
device approved by the Director Petroleum Resources shall be allowed to run for 24 hours 
(8am-8am). Thereafter, the sample in the receiver shall be transferred to the laboratory for 
quality analysis either in the receiver, if it is the removable type, or in a secondary receiver, 
which shall be a well labeled container made of suitable material after proper mixing within 
the primary receiver to ensure that the original homogeneity is maintained. 
 
2.5.5.3 The following records should be made after each loading operation:  
i. 
Sample reference number. 
ii. 
Identification of shipment or transfer. 
iii. 
Petroleum and petroleum product type. 
iv. 
Date and time of commencement of sampling.  
v. 
Date and time of completion of sampling. 
vi. 
Nominated expected flow rate. 
vii. 
Maximum expected flow rate. 
viii. 
Sample grab size. 
ix. 
Sample rate. 
x. 
Calculated sample volume. 
 
Time 
Total 
Quantity 
of 
Petroleum 
and 
petroleum 
product 
Transferred 
Target sample 
Quantity 
Actual 
sample 
Quantity 
% 
of 
Total 
Petroleum 
and 
petroleum product 
Transferred 
% of Total 
sample 
Collected