Library / © 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
© 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
Page 27 of 114
26 | P a g e 2.5.5.4 The date logged above shall be used to determine the validity of sample collected and will reflect the performance efficiency of the sampler to ascertain when any equipment failure may have occurred. Appropriate corrective action shall be taken whenever a failure is observed. 2.5.6 Maintenance and Proving of Automatic Sampler 2.5.6.1 The sampling system shall be proved before installation and annually thereafter by injecting known quantity of water into the petroleum and petroleum product’s stream passing through the sampler. Alternatively, the grab efficiency of the sampler shall be determined. 2.5.6.2 Analysis of the samples taken from the stream is then compared with the total value of initial BS&W content of the petroleum and petroleum product and the additional water injected. 2.5.6.3 The detailed procedure for carrying out the exercise shall be as outlined in ASTM D4177/API MPMS Chapter 8. 2.5.6.4 An official of the Department of Petroleum Resources shall be present during the proving and shall countersign the official record of the result of the exercise which shall then be sent to the Director of Petroleum Resources for approval. It should however be noted that for water injection method, the acceptance shall conform to ASTM D4177. 2.5.6.5 No new sampling equipment shall be commissioned for operations without the approval of the Department of Petroleum Resources and any existing sampler that fails to be approved after a proving exercise shall be decommissioned immediately and appropriate corrective action taken by the operator. 2.5.6.6 The associated flow meter serving as the pacing device of the sampler shall be calibrated monthly by the normal procedure for proving such measuring devices. All relief valve installed on the sampler receiver shall be checked and cleaned after every six months of operation. 2.5.6.7 For every custody transfer operation, the auto sampler grab performance factor shall be between 1 ± 0.10, which shall be calculated as follows: Performance factor = 𝑆𝑎𝑚𝑝𝑙𝑒 𝑉𝑜𝑙𝑢𝑚𝑒 𝐶𝑜𝑙𝑙𝑒𝑐𝑡𝑒𝑑 (𝑚𝑙) 𝑆𝑎𝑚𝑝𝑙𝑒 𝑉𝑜𝑙𝑢𝑚𝑒 𝐶𝑎𝑙𝑐𝑢𝑙𝑎𝑡𝑒𝑑 (𝑚𝑙)
GuidelinesPDF27