Afrindustria/ Gas Gap Monitor

Library / © 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE

© 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE

Page 45 of 114

Open the PDF at page 45

 
44 | P a g e 
 
 
6.4.2 No deduction (losses, theft, etc.) shall be made from any third party injector’s volume 
without approval from the DPR. 
6.4.3. The DPR Methodology for Determination and Allocation of Crude Oil Production and 
losses (as revised from time to time) shall be used by terminal operators and Injectors 
for computation. 
6.5 Crude oil Transportation and Handling Agreements (CTA/CHA) 
6.4.1 Where two or more companies intend to enter into CTA/CHA, the agreement shall be 
transparent, fair and in conformity with oil and gas transportation and handling 
international best practices. The Department shall also be notified for guidance. 
6.4.2 Methodologies for determination of Production/Injection/Allocation included in any 
CHA/CTA shall comply with the provisions of this procedure guide and/or as approved 
by the Director of Petroleum Resources.