Library / © 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
© 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
Page 51 of 114
50 | P a g e Petroleum Resources and shall remain unchanged. However, for factors that can affect the quantities measured by the meter that must be changed, an approval shall be granted by the Director of Petroleum, and adjustments must be retained in the audit trail. 1.8.3.2 Meter factors shall be determined over a range of flow rates. The various meter factors can then be used to linearize the output from the Ultrasonic flowmeter at varying flow rates. If the meter is used to measure bidirectional flow, a meter factor should be developed for each direction. 1.9 General Regulation 1.9.1 All meters at facilities shall be proved during every loading operation or at other frequencies approved by the Department of Petroleum Resources while those at other custody transfer points shall be proved fortnightly in accordance with the procedure outlined in this guide. Production meters shall be proved monthly. 1.9.2 Meters shall be proved under their normal operating conditions with the same type of liquid being measured by them. 1.9.3 Meter Linearity test shall be conducted annually during annual recertification exercise or when the need arises and a performance (linearity) table and curve shall be established for each meter as outlined in this guide. 1.9.4 All meters shall be proved before being put to use and also after maintenance. 1.9.5 Continued acceptance of a meter for use shall depend on its maintenance of satisfactory performance during successive meter proving (or linearity) as adjudged within the set down tolerance limits. 1.9.6 Each meter in the bank shall be equipped with adequate protection devices such as valves, air eliminators, flow conditioning vanes and other measuring instruments as indicated on the approved Detailed Engineering Design (DED). 1.9.7 The flow conditioning vanes shall be installed within a distance of 5D (5*internal diameter) of the pipe upstream the meter where applicable. 1.9.8 The meter shall be in the same horizontal plane with the pipeline. 1.9.9 The meter bank shall be equipped with a dedicated prover preferably the pipe prover type. Provisions shall be made for proving meters at other measurement points by any of the methods specified in this guide. 1.9.10 Installation and commissioning shall follow appropriate reviews and approvals by the Department of Petroleum Resources of factory calibration and on-site control proving. 1.9.11 A control chart shall be established and maintained for each flow meter. 1.9.12 Results of all proving shall be carefully interpreted to identify the maintenance requirements that are due. Determination of when to repair or inspect a meter shall be by keeping a control chart of its meter factor values for each product or grade of petroleum and petroleum products. Small random changes in meter factor will naturally occur in normal operation, but if the value of such a change in meter factor
GuidelinesPDF51