50 | P a g e 
 
 
Petroleum Resources and shall remain unchanged. However, for factors that can 
affect the quantities measured by the meter that must be changed, an approval shall 
be granted by the Director of Petroleum, and adjustments must be retained in the 
audit trail.  
1.8.3.2 Meter factors shall be determined over a range of flow rates. The various meter 
factors can then be used to linearize the output from the Ultrasonic flowmeter at 
varying flow rates. If the meter is used to measure bidirectional flow, a meter factor 
should be developed for each direction. 
 
1.9 General Regulation 
1.9.1   All meters at facilities shall be proved during every loading operation or at other 
frequencies approved by the Department of Petroleum Resources while those at 
other custody transfer points shall be proved fortnightly in accordance with the 
procedure outlined in this guide. Production meters shall be proved monthly. 
1.9.2 Meters shall be proved under their normal operating conditions with the same type of 
liquid being measured by them. 
1.9.3 Meter Linearity test shall be conducted annually during annual recertification exercise 
or when the need arises and a performance (linearity) table and curve shall be 
established for each meter as outlined in this guide. 
1.9.4 All meters shall be proved before being put to use and also after maintenance. 
1.9.5 Continued acceptance of a meter for use shall depend on its maintenance of 
satisfactory performance during successive meter proving (or linearity) as adjudged 
within the set down tolerance limits. 
1.9.6 Each meter in the bank shall be equipped with adequate protection devices such as 
valves, air eliminators, flow conditioning vanes and other measuring instruments as 
indicated on the approved Detailed Engineering Design (DED). 
1.9.7 The flow conditioning vanes shall be installed within a distance of 5D (5*internal 
diameter) of the pipe upstream the meter where applicable.  
1.9.8 The meter shall be in the same horizontal plane with the pipeline. 
1.9.9 The meter bank shall be equipped with a dedicated prover preferably the pipe prover 
type. Provisions shall be made for proving meters at other measurement points by any 
of the methods specified in this guide. 
1.9.10 Installation and commissioning shall follow appropriate reviews and approvals by the 
Department of Petroleum Resources of factory calibration and on-site control 
proving. 
1.9.11 A control chart shall be established and maintained for each flow meter. 
1.9.12 Results of all proving shall be carefully interpreted to identify the maintenance 
requirements that are due. Determination of when to repair or inspect a meter shall 
be by keeping a control chart of its meter factor values for each product or grade of 
petroleum and petroleum products. Small random changes in meter factor will 
naturally occur in normal operation, but if the value of such a change in meter factor