Afrindustria/ Gas Gap Monitor

Library / © 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE

© 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE

Page 68 of 114

Open the PDF at page 68

 
67 | P a g e 
 
 
purpose of drawing up a calibration chart for the tank to show quantity of petroleum and 
petroleum products at any given depth. 
2.5.3 Frequency of Calibration 
2.5.3.1 All new tanks shall be calibrated before commissioned to service and mandatorily 
after every five years of its operational life. 
2.5.3.2 A tank shall also be automatically due for recalibration, if the circumferential reading 
shows a difference of 0.015% and above, at a reference point, over the reading of the 
last calibration of the tank. 
2.5.3.3 A tank shall be recalibrated whenever the deadwood has changed in configuration 
or arrangement. 
2.5.3.4 A tank shall be recalibrated on relocation of the tank to another position. 
2.5.3.5 A tank shall be recalibrated after any major repair or maintenance of the tank 
2.5.4 Applicable Standard 
Calibration method shall be as outlined in latest American Petroleum Institute Manual of 
Petroleum Measurement Standard (API MPMS) Chapters 2.2A, 2.2B, 2.2D, 2.2F, API Standard 
2555 (Method of Calibration by Liquid Calibration) as well as ISO 7507-5. 
2.5.5 General Practices 
2.5.5.1 Before a tank is calibrated, it shall be ascertained that the tank has been filled at least 
once with a liquid of a density equal to or greater than the normal service liquid. 
2.5.5.2 All tanks in service shall be cleaned out and checked for bottom alignment every five 
years.  
2.5.5.3 Any maintenance or repair job that involves replacement of plate sections or 
alteration of the “Deadwood” of the tank shall automatically invalidate the existing 
tank capacity tables and a new calibration of the tank shall be carried out before re-
commissioning. 
2.5.5.4 Any modification to the tank changes its capacity by more than 0.015% of the original 
shall invalidate the existing tank table. 
2.5.5.5 There shall be no movement of petroleum or petroleum products into or out of the 
tank during calibration. 
2.5.5.6 Before a tank shall be deemed ready for calibration, it shall be thoroughly cleaned 
and degassed. 
 
2.5.6 Manual Tank Strapping 
2.5.6.1 Calibration Equipment 
These shall be as stated in the reference standards and shall comply with appropriate 
specifications. The essential equipment shall be the same with those for taking 
measurements of tank shells above ground and shall always be maintained in good 
condition. Both the tape for height measurement and that for circumference measurement 
shall themselves have been calibrated in accordance with the Part III Section 2.4 or possess 
a current certificate of recent calibration at 68ᵒF (20ᵒC) in accordance with a recognized 
National Bureau of Standard. Also, the equipment for determining temperature and gravity 
shall be as follows: -