Library / © 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
© 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
Page 71 of 114
70 | P a g e
Ring No.
Thickness
Type
of
Vertical
Joint
Set in/out
Thickness of Lap
or Strap
No.
of
Joints
Deadwood Records:
Description
Number
Size
Elevation
From
To
Type of bottom:
Height of Crown:
Other Details:
Calibration Company:
Measurements by:
DPR official witnessing:
2.5.8.2 Calibration Chart
2.5.8.2.1 This shall contain information on the nominal dimensions of the tank, the weight of
floating roof where applicable, the critical zone and any other special conditions.
2.5.8.2.2 In addition to the main calibration table for the whole height of the tank (except
the critical zone) which shall be in volume at 60ᵒF, floating roof displacement table
and the calibration table for the critical zone of the tank shall be included in the main
chart. Calibration chart shall conform generally with the format sketched below:
Location:
Date of Calibration:
Name/ Address of Calibration Company:
Name of Operator:
Tank No:
Nominal Dimensions:
Nominal Capacity:
Weight of Floating Roof:
Table Volume at Standard Temperature of 60OF:
Other Special Conditions:
Production Depth:
Cumulative U.S. Barrels:
Prepared By: Approved By:
……………………… ……………………….
Calibration Company Rep Director of Petroleum
Resources
GuidelinesPDF71