Library / © 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
© 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
Page 75 of 114
74 | P a g e of water into the barge tank being calibrated and recording the height of the liquid above datum in the tank or any other method as approved by Director of Petroleum Resources. 2.7.4 Frequency of Calibration All storage vessels/tanks shall be calibrated before being put into operation and subsequently after five operational years or after any maintenance work necessitating changes to the deadwood of the tanks in the form of size, number and arrangement. 2.7.5 Applicable Standard This shall be API MPMS 2.8A, API Standard 2553 or ASTM –D1407 under title “Measurement and Calibration of Barges”. 2.7.6 Calibration Equipment The basic and accessory equipment shall be as specified in the reference standards and shall comply with the specifications stipulated therein. 2.7.7 Calibration Procedure 2.7.7.1 Each tank shall be thoroughly cleaned prior to calibration and water shall be used as the calibrating liquid. The shore tank containing the calibrating liquid shall itself must have been calibrated in accordance with Part III Section 2.5 of this guide and in which details of the approved procedure for calibrating vertical cylindrical tanks has been outlined. 2.7.7.2 Liquid draw from the shore tank shall be by gravity drive. However, if the storage vessels are to be calibrated using meters, then the measurement procedure shall be as stipulated in API Standard 2555, ASTM D-1406 and API MPMS Chapter 5.2. The procedure outlined in reference standard shall be generally followed to obtain the internal tank measurements, temperature and gravity parameters, linear deck measurements and deadwood measurements. 2.7.7.3 Calculation of the barge tank capacity and incremental volume shall be made in accordance with the steps outlined in the reference standard. 2.7.8 Presentation of Results 2.7.8.1 The field data to be submitted along with the calibration chart of each tank in the storage vessels shall contain the following information: a) Name of storage vessel. b) Name and address of operating Company. c) Name and address of calibrating company. d) Name of builders of the storage vessel, the date of construction and date of last calibration of tank. e) Nominal capacity. f) Compartment or tank number. g) Total height. h) Linear measurements. i) Deadwood description. j) Gross Volumes. 2.7.8.2 The calibration chart shall be prepared showing the incremental net volumes at 60ᵒF with appropriate indication of the total under deck cargo capacity.
GuidelinesPDF75