84 | P a g e Qi is the actual measured mass flow rate passing through a meter under a specific set of test or operating conditions Qmin is the minimum allowable mass flow rate through the meter, as specified by the meter manufacturer Qmax is the maximum allowable mass flow rate through the meter, as specified by the meter manufacturer 1.12.4 Field Meter Validation The following general meter verification procedures shall be performed on quarterly basis during the meter validation exercise: 1.12.5 Meter Transmitter Verification The meter transmitter verification should coincide with the meter zero check. It should include the following procedures: • Verify the sensor calibration and correction factors in the configuration of the transmitter to be unchanged from most recent calibration. • Verify all transmitter diagnostic indicators to be in the normal state. 1.12.4.2 Coriolis Sensor Verification Sensor diagnostics may be available that continuously, on-command or procedurally verify the performance of the sensor and/or infer change in measurement performance. Meter manufacturer should be consulted for the availability of these types of diagnostics. 1.12.4.3 Temperature Verification Spot checks shall be conducted by placing a temperature probe through the thermowell to verify the reading of the Coriolis temperature transmitter which monitors the temperature element bonded to the flow tubes of the Coriolis sensor. 1.12.4.4 Density verification The density verification shall be carried out by passing a gas of known density and components (calibration gas) through the densitometer and/or Gas chromatograph. The Densitometer shall be the primary means of density measurements at custody transfer points. 1.12.4.5 Meter Zero Verification A change in the meter zero value can be used as an indicator of change in the metering conditions. The meter zero should be checked at flowing pressure and temperature within 1 to 4 weeks of installation and quarterly during its field service years. The meter zero verification should include the following procedures: i. Ensure thermal stability ii. Record the as-found zero iii. Verify the indicated meter zero value to be within manufacturer specification limits • If meter zero is within specification, • record the as-left meter zero value, and • return the meter to service.
GuidelinesPDF85