89 | P a g e 1.15.9 Associated flow computer The associated flow computer must be installed to correct the volume rate and accumulated volume for pressure, temperature and compressibility, and to provide necessary data retention for audit trail. 1.15.10 Density measurement A densitometer/ Gas chromatograph should be installed downstream of the UM to take density measurements. 1.15.11 Orientation of Meters The metering package should be oriented during flow calibration to match the field installation. 1.15.12 Meter Tube Inspection and Cleaning Ports Meter tube inspection ports should be located a minimum of 3 ND downstream and/or upstream of the ultrasonic flow-meter body flanges. Inspection ports for the flow conditioner should be located 3 ND upstream of the flow conditioner. The port diameter should not exceed 6% of the pipe diameter for meters larger than 1 2” and 0 .750” for meters 12” and smaller. 1.15.13 Flow conditioner Installation of flow conditioners shall be as recommended in AGA Report No.9 2017 – Measurement of Gas by Multipath Ultrasonic Meters. 1.15.14 Flow Computer Calculations The necessary calculations are summarized in the following expressions 𝑄𝑏= 𝑄𝑓(𝑃𝑓 𝑃𝑏 ⁄ )(𝑇𝑏𝑇𝑓 ⁄ )(𝑍𝑏𝑍𝑓 ⁄ ) 𝑉𝑏= ∫𝑄𝑏𝑑𝑡 Where Qb = flow rate at base conditions Qf = flow rate at flowing conditions Pf = absolute static pressure of gas at flowing conditions Pb = base pressure, typically atmospheric pressure (101.325Kpa) Tb = base temperature Tf = absolute temperature of gas at flowing conditions Zb = compressibility factor of gas at base conditions Zf = compressibility factor of gas at flowing conditions Vb = accumulated volume at base conditions dt = integration increments of time (per second)
GuidelinesPDF90