Library / © 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
© 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
Page 98 of 114
97 | P a g e blowdown, purging, or ESD operation the meter readings so recorded shall be forwarded within 24hours to the DPR nearest office with a detailed report on the scenarios of releases. This report shall form the basis of no charge on the flare gas releases. If the flare releases are operational philosophy the meter reading shall comply with fuel gas measurement systems and all the conditions attached thereof. 1.20 GAS SAMPLER SYSTEMS 1.20.1 Functional requirements 1.20.1.1 General The system shall collect and store a representative gas sample at line conditions, allowing it to be transported to the laboratory for analysis. The system shall be mounted as close as possible to the pipeline to collect samples over a sample period, unattended. The system shall be in accordance with ISO 10715. The distance to the nearest upstream disturbance, shall be at least 20 ID. The measurement system shall control an automatic gas sampler system, i.e. • provide a flow proportional by mass pacing signal (and a fall-back signal) • monitor the sample volume collected and status of the sampling system. In addition, there shall be a manual sample point, where the manual sampling probe shall be installed such that a representative sample of the gas can be collected. The distance to the nearest upstream disturbance, shall be at least 20 ID. However, if an auto-sampler or OGC sampling probe is included in the measurement system the manual sampling may be taken from the same probe. 1.20.2 Equipment/Schematic The system consists of a probe, a by-pass loop, two separating devices (sample collection pumps), an instrumentation supply system, a timing system and two sample receivers (collection cylinders) for sample transportation. The sample equipment shall be contained in a cabinet with exception for: • the probe, • tubing to/from the mainline and • the back-pressure system. The manual sample point shall be equipped with flushing facilities and a cabinet/enclosure with required valves and quick connectors in addition to an arrangement where the sample cylinder can be placed during spot sampling. 1.20.3 Performance 1.20.3.1 General ISO 10715 describes the performance requirements for a fiscal sampling system. 1.20.3.2 Operational Requirements The control function shall be done from a dedicated controller, SAS or a measurement system. There shall be monitoring of maximum filling with adjustable alarm setting. In addition, the measurement system shall provide a flow proportional pacing signal and monitor the sample volume collected and status of the sampling system. 1.20.3.2.1 Isolating and Sectioning It shall be possible to isolate the system from the main process. 1.20.3.2.2 Layout Requirements ISO 10715 describes the layout requirements for a fiscal sampling system.
GuidelinesPDF98