Library / © 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
© 2019 Department of Petroleum Resources. All rights reserved Department of Petroleum Resources (DPR) PROCEDURE GUIDE
Page 99 of 114
98 | P a g e 1.20.3.2.3 Interface Requirements The system shall be controlled and monitored from the measurement computer or SAS. 1.20.3.3 Technical requirements 1.20.3.3.1 Initial selection of automatic probe location The sample point shall be chosen to provide a representative sample of the flowing gas in the pipe. The sampling point shall be installed at least 20 diameters downstream of the nearest bend or restriction on a horizontal pipe. The probe shall be installed in a 10 - 2 o'clock position. 1.20.3.3.2 Probe design The probe shall be a pilot tube type extending into the centre one-third of the pipeline diameter. In addition, the sampling probe should be possible to retract under operating pressure by method accepted by the operator. 1.20.3.3.3 Sample collection pump There shall be two parallel sample collection pumps, which shall be self-purging and can operate under line conditions. The grab size volume shall be adjustable in the range 0.5 – 1.5 ml. The sample collection pumps shall be located above and as close to the probe as is practically possible. Filters, drip pots, screens, regulators and such conditioning equipment shall not be placed between the probe and the sampler. 1.20.3.4 Sample receiver • There shall be two parallel sample receivers. • The filling of the two sample receivers shall have a maximum deviation of ± 5 %. • Heat tracing and insulation shall be provided to keep the temperature minimum 10 ° C above the condensation temperature. • The receivers shall be of the floating piston type with back-pressure of an inert gas. • The receivers shall be equipped with a local piston position indicator and a limit switch for maximum filling. 1.20.3.5 Tubing and valves • The temperature in all parts of the sample lines/tubing and sample receivers shall be kept at a temperature minimum 10 ° C above the hydrocarbon dew point temperature. • The valves for the sampling system shall be of type full-bore ball valves. • The sample tubing from/to the main pipe should have a slope of at least 1:12 to avoid liquid traps. 1.20.3.6 Back-pressure system There shall be a back-pressure system with inert gas (argon or helium). This shall include a booster facility. The back-pressure volume shall be at least five times larger than the receiver volume and of a size so that the pressure increase caused by 100% sample filling is less than 10 bar.
GuidelinesPDF99