Library / Applicable to all Oil & Gas Operators PROCEDURE GUIDE FOR THE GRANT OF APPROVAL FOR THIRD PARTY BLENDING AND LUBRICANTS FILLING PLANT Code: DPR Guide 0017 - 2020
Applicable to all Oil & Gas Operators PROCEDURE GUIDE FOR THE GRANT OF APPROVAL FOR THIRD PARTY BLENDING AND LUBRICANTS FILLING PLANT Code: DPR Guide 0017 - 2020
Page 8 of 11
Applicable to all Oil & Gas Operators PROCEDURE GUIDE FOR THE GRANT OF APPROVAL FOR THIRD PARTY BLENDING AND LUBRICANTS FILLING PLANT Code: DPR Guide 0017 - 2020 Revision Date: 2nd October 2020 This is a property of the Department of Petroleum Resources. All rights reserved 4 ix. The filling plant engineering design details showing interface with associated auxiliaries. Upon submission of the above, a Site Suitability inspection exercise shall be conducted by the Department (Requirement for suitability of site are stated in appendix 1). The Department shall grant an Approval to ConstructIinstall the filling plant upon satisfactory appraisal of the submission. 2.2.2 Licensing/Approval Process Upon completion of construction/Installation of the filling plant, the applicant shall: i. Apply for Approval/License to Operate the filling plant on the company’s letter headed paper. ii. Submit evidence of payment of Statutory and Processing fees of N75,000/500,000 litres and/ or part thereof and N250,000.00 respectively via DPR Online Payment Portal for issuance of Approval/License to Operate the filling plant. iii. Submit a Third-Party Blending Agreement with a licensed blending company where the blending operation is to be carried out stating the following details: a. Total quantity in litres of lubricants to be blended broken downs into respective grades. b. Quality specification of lubricants to be blended c. Blending Laycan iv. Forward a copy of valid lube blending plant license for the blending company where the lubricants are to the blended. v. Install an on-site Quality Control laboratory for recertification of the bulk lubricant blend upon arrival at the filling plant to ensure that there is no alteration of quality parameters over the transit process. vi. Install Safety and Firefighting facilities at the filling plant.
CodesPDF20202020-108