Applicable to all Oil & Gas Operators  
 
SAFETY CASE GUIDELINES FOR OIL AND GAS FACILITIES IN NIGERIA 
                Code: DPR GUIDE 0036 – 2020 
 
Revision Date: 2nd October 2020 
 
 
 
This is a property of the Department of Petroleum Resources. All rights reserved  
 
at different stages in the life of the facility. The collective aim of this section is to improve safety 
in the operations of the facility, as failure to close out identified action(s) may weaken the full and 
successful implementation of the Safety Case. 
4.8 
Other Relevant and Supporting Information  
This generally includes information, documents, studies, etc., which is believed to enhance the 
arguments in the Safety Case to further demonstrate the intent of the Safety Case and safe 
operations of a facility. Such information may include the following: 
i. 
elaboration of key evidence(s) referenced or not referenced within the Safety Case 
ii. 
details and results/recommendations of safety studies conducted 
iii. 
important appendices; and 
iv. 
other information which enhance or demonstrate safety that may not have been integrated in 
the preceding or other sections.  
v. 
Concluding and further assurance statements etc. 
 
5 
SUBMISSION AND APPROVAL PROCEDURE 
5.1 
Submission Overview  
Safety Case submission to the DPR and obtainment of approval of same from DPR is a 
requirement for all installations operating, to be operated or to be decommissioned in the 
Nigerian oil and gas Industry. Therefore, it constitutes a non-compliance for any Operator/Facility 
owner in Nigeria to complete design, commence operation, continue operation, undergo major 
modification/upgrade/debottlenecking etc. or commence decommissioning of any oil and gas 
facility in Nigeria without an applicable Safety Case that is approved by the DPR.  
In making the submission for the Safety Case, section 4 of this guideline only serves as a guide. 
The proponent has the flexibility of preparing the Safety Case as it applies to their facility. 
However, the Operator/Facility owner is to ensure that the Safety Case contains detailed 
evidential information, appropriate facility specification (as opposed to generic information), 
specific hazards and risks of the facility. Also, the proponent through the Safety Case is to relate