Library / B 855 Federal Republic of Nigeria Official Gazette No. 88
B 855 Federal Republic of Nigeria Official Gazette No. 88
Page 23 of 34
B 877
TABLE 16
1.
Licence To Establish (LTE)
2.
Licence to Construct/Install
3.
Pressure Test Authorisation
4.
Licence to Operate (New/Renewal)
every 2 years
5.
Authorisation for Modification
6.
Tank Burial Authorisation
7.
Instrument/dispenser calibration
0.1MT - 5MT = NGN 100,000
5.1MT - 10MT = NGN 200,000
10.1MT - 60MT = NGN 300,000
60.1 - 300MT = NGN 500,000
0.1MT - 5MT = NGN 100,000
5.1MT - 10MT = NGN 200,000
10.1MT - 60MT = NGN 300,000
60.1 - 300MT = NGN 500,000
NGN 150,000
0.1MT - 5MT = NGN 100,000 p.a
5.1MT - 10MT = NGN 200,000 p.a
10.1MT - 60MT = NGN 300,000 p.a
60.1 - 300MT = NGN 500,000 p.a
NGN 150,000
NGN 150,000
NGN 100,000
P
PETROLEUM PRODUCTS (GAS) RETAILING OPERATIONS AND INFRASTRUCTURE
(LPG REFILLING PLANT, AUTOGAS PLANT, LPG ADD-ON)
Activity
Application Fee
Processing
Fee
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
5 – 100MT =
NGN50,000 p.a
and Additional
10MT or part
thereof (Above
100MT) =
NGN5,000 (p.a)
N/A
N/A
N/A
TABLE 17A
1.
Licence To Establish (LTE)
NGN 500,000
N/A
2.
Licence to Construct
NGN 1,000,000
N/A
3.
Licence to Operate
NGN 2,000,000
N/A
Q
RETAIL GAS LICENCE (CNG COMPRESSION FACILITIES (Mother Station))
Activity
Application Fee
Processing
Fee
RegulationsPDF20242024-1123