Afrindustria/ Gas Gap Monitor

Library / B 855 Federal Republic of Nigeria Official Gazette No. 88

B 855 Federal Republic of Nigeria Official Gazette No. 88

Page 26 of 34

Open the PDF at page 26

B  880
THIRD  SCHEDULE
[regulation 5(1) (c)]
MIDSTREAM AND DOWNSTREAM PETROLEUM MEASUREMENT SYSTEMS
1.
Licence To Construct (LTC) a metering system
2.
Licence To Operate a LACT/Metering system
3.
Calibration/Recertification of LACT
4.
Tank Calibration Approval for hydrocarbon processing
plants
5.
Calibration of Crude Oil Vessel Storage Tank- for vessels
with capacity greater than 600,000BBLs
6.
Calibration of Crude Oil Vessel Storage Tank- for vessels
with capacity between 20,001 to 600,000BBLs
7.
Calibration of Crude Oil Vessel Storage Tank- for vessels
with capacity less than 20,000 BBLs
8.
Calibration Of Truck
9.
Terminal or Refinery Storage Tank Calibration /
Recertification (petroleum liquids and natural gas)
10.
Coastal Vessel Tank Calibration
11.
Tank Calibration Authorisation (petroleum products depot)
12.
Tank Calibration Authorisation (gas depot)
13.
Integrity Test Authorisation (storage tanks, vessel tanks, or
other pressure vessels)
     Activity
Application Fee
USD 2,000
USD 10,000
USD 1000
USD 500 per tank
USD 500 per tank
USD 300 per tank
USD 150 per tank
NGN 10,000 per truck
USD 500 per tank
NGN 300,000 per vessel
USD 500 per tank or its
NGN equivalent
NGN 500,000 per tank
NGN 100,000 per tank or
per vessel/pressure
vessel