Afrindustria/ Gas Gap Monitor

Library / B 855 Federal Republic of Nigeria Official Gazette No. 88

B 855 Federal Republic of Nigeria Official Gazette No. 88

Page 32 of 34

Open the PDF at page 32

B  886
SIXTH   SCHEDULE
[regulation 5(1) (f )]
ASSIGNMENT OR TRANSFER OF LICENCE OR PERMIT
TABLE 1
The transferee shall be required to pay the applicable assignment or transfer of licence or
permit processing fee in table 1 below, or five per cent of the value of transaction,
whichever is higher —
S./N
                    Facility
1.
Petrol liquids/gas retail outlets
2.
Depots
3.
Blending Plants/Waste
RecyclingPlants /Bitumen Emulsion
Plants/ Refilling Plants/Thermal
Desorption Units
4.
Hydrocarbon Processing Plant
(Refineries, Petrochemicals and Gas
Processing facilities)
5.
Pipeline
6.
Pipeline Distribution Network
7.
Pipeline Transportation Network
8.
Terminals
9.
CNG Compression Station/Small
Scale LNG Installations
NGN 500,000
NGN 10,000,000
NGN 3,000,000
USD 10,000 for capacities less than 1,000
BPSD, or less than 6MMSCFD
USD 50,000 for capacities between 1,000 and
30,000 BPSD, or between 6MMSCFD and
180MMSCFD
USD 150,000  for capacities above 30,000
BPSD, or above 180MMSCFD
USD 500 per km
USD 200 per km
USD 250 per km
USD 200,000
NGN 500,000
Processing  Fees
S/No.
                    Activity
Change of name not constituting an
assignment or transfer
NGN 250,000
Processing  Fees
TABLE  2