Library / B 2103 Federal Republic of Nigeria Official Gazette No. 205
B 2103 Federal Republic of Nigeria Official Gazette No. 205
Page 21 of 82
B 2123 28.—(1) The shore figures shall be regarded as the official fiscalised figures for any discharge or lifting of petroleum liquids or natural gas or its derivatives, except where the measurement system is on the vessel and certified by the Authority. (2) Where the figure recorded on board a vessel (ship figure) exceeds that recorded on shore, the limit of tolerance allowed for these variations shall depend on the cargo quantity expressed in long tons or metric tons and the allowance as prescribed by the Authority. (3) Where the difference between the ship and shore figures recorded exceeds the allowable limits as prescribed by the Authority, the vessel shall not be cleared to sail until a written undertaking is given by the vessel captain or the facility operator for the Authority’s verification of the outturn discharge of the vessel at port of discharge or any other means as may be directed by the Authority. (4) A facility or vessel owner who fails to comply with the outturn verification process within 60 days of a demand by the Authority shall be subject to the penalties stipulated in these Regulations and in addition may not be permitted to discharge or lift petroleum liquids or natural gas or its derivatives from any Nigerian facility until the Authority is satisfied that such facility or vessel owner has complied with the process. (5) A vessel which records differences between ship and shore figures exceeding the tolerance limit for three consecutive discharges or liftings shall not be permitted to discharge or lift cargo from any facility in Nigeria until satisfactory evidence is provided to the Authority showing that the vessel’s measurement device is recalibrated afterwards. PART III — PETROLEUM MEASUREMENT 29.—(1) A licensee or permit holder subject to the petroleum measurement provisions of these Regulations shall ensure that measurement systems are installed and operated at appropriate measurement points in midstream and downstream petroleum operations. (2) Where a licensee or permit holder fails to install or operate an appropriate measurement system within 30 days after commissioning of a facility, the Authority may direct a third-party to install or operate a measurement system for the facility, and the licensee or permit holder who has failed to install or operate the measurement system shall be responsible for the costs incurred by the third- party so directed by the Authority. (3) The appointment of a third-party by the Authority to install or operate a measurement system shall be through competitive bidding. (4) A licensee or permit holder under subregulation (2) of this regulation shall be notified by the Authority prior to the appointment of the third-party, who shall install or operate the measurement system. 30. A licensee or permit holder subject to the petroleum measurement provisions of these Regulations shall — Ship and shore differences Requirement of measurement systems Quality of metering activities
RegulationsPDF20252025-1221