Library / B 2103 Federal Republic of Nigeria Official Gazette No. 205
B 2103 Federal Republic of Nigeria Official Gazette No. 205
Page 28 of 82
B 2130 45.—(1) The Authority may upon application made not later than one month to the expiration of a licence to establish a pipeline and the payment of prescribed fees, revalidate the licence, provided that a re-inspection of the right of way does not indicate a significant change to the conditions under which the licence was earlier granted. (2) Where a re-inspection of the right of way indicates a significant change to the conditions under which the licence to establish a pipeline was granted, all processes applicable to the grant of the licence shall apply to the application for revalidation. 46. —(1) A petroleum pipeline licence shall — (a) grant the holder the right to construct, operate and maintain a pipeline on the pipeline right of way; and (b) be valid for a term of 20 years and may be renewed for further terms, provided that the duration of a petroleum pipeline licence renewal shall be determined by the integrity of the pipeline, based on the report of the integrity inspection of the pipeline and other industry standards. (2) An application for a petroleum pipeline licence shall be made during the validity of the licence to establish a pipeline, in a form and upon terms and conditions prescribed by the Authority, and shall be accompanied by — (a) a pipeline development plan; (b) a copy of the licence to establish the pipeline; (c) a survey description of the final route selected for the pipeline, indicating the length and width of the right of way, the pipeline coordinates in approved CRS with the coordinates of the various points of intersection; (d) a topography map showing the pipeline in red; and (e) evidence of the payment of the prescribed fee. (3) The pipeline development plan shall be prepared in the format prescribed by the Authority and shall include — (a) detailed report of the pipeline route survey showing the coordinates of the turning points; (b) the services to be rendered by the pipeline; (c) the preliminary specifications of the pipeline; (d) the characteristic of the substances to be conveyed through the pipeline; (e) the detailed financial plan and economic case for the development of the pipeline; (f ) local content proposal for the project; (g) community development plan; (h) level two schedule for pipeline design, development, construction and start-up of operations; (i) a Front-End Engineering Design ‘‘FEED’’ or Detailed Engineering Design ‘‘DED’’ dossier of the pipeline; Revalidation of a licence to establish a pipeline Application for a petroleum pipeline licence
RegulationsPDF20252025-1228