Library / B 2103 Federal Republic of Nigeria Official Gazette No. 205
B 2103 Federal Republic of Nigeria Official Gazette No. 205
Page 4 of 82
B 2106 26. Prohibition of loading, importation, or trans-shipment in an unauthorised location 27. Duty to obtain a coastal vessel licence 28. Ship and shore differences PART III — PETROLEUM MEASUREMENT 29. Requirement of measurement systems 30. Quality of metering activities 31. Information reporting 32. Measurement standards 33. Classes of dynamic measurement 34. Calibration and traceability 35. Reference conditions 36. By-pass of measurement system 37. Measurement methods 38. Metering system design 39. Testing, calibration and inspection of measurement system 40. Operation and maintenance of measurement system 41. Operations management and supervision of metering systems 42. Measurement loss and shrinkage PART IV — PETROLEUM PIPELINES 43. Prohibitions 44. Licence to establish a pipeline 45. Revalidation of a licence to establish a pipeline 46. Application for a petroleum pipeline licence 47. Third-party consent 48. Permit to operate a petroleum pipeline PART V — HYDROCARBON REFINING AND PROCESSING FACILITIES 49. Standards for design, construction and inspection of hydrocarbon refining and processing facilities 50. Engineering and technical studies or review 51. Design optimisation or modification 52. Fabrication and inspection 53. Sparing philosophy 54. Pre-commissioning and readiness for start-up 55. Requirements for commissioning 56. Facility commissioning 57. Application for licence to operate a crude oil refinery, etc 58. Modification of existing facilities 59. Maintenance management 60. Sustainable water management 61. Crude oil requirements for refineries 62. Decommissioning and abandonment of hydrocarbon refining or processing
RegulationsPDF20252025-124