Library / B 2103 Federal Republic of Nigeria Official Gazette No. 205
B 2103 Federal Republic of Nigeria Official Gazette No. 205
Page 77 of 82
B 2179 71. False declaration regarding the quantity, quality and capacity of a vessel in which petroleum liquids or natural gas or its derivatives are being transported. 72. Alteration of any document or concealing information in respect of the lifting of natural gas or its derivatives, petroleum liquids or petroleum products by a vessel. 73. Unauthorised loading, unloading and trans-shipment of petroleum liquids or natural gas and its derivatives. 74. Loading, unloading and trans-shipment of petroleum liquids or natural gas and its derivatives from an unauthorised location. 75. Backloading of petroleum liquids in a refinery. 76. Measuring petroleum liquids (crude oil, natural gas and condensates) at custody transfer or sales points with faulty or uncalibrated measuring equipment, Ullage Temperature Interface ‘‘UTI’’ or metering system. 77. Measuring petroleum products at retail outlets with faulty or uncalibrated measuring equipment or Ullage Temperature Interface UTI. 78. Failure to apply the Authority methodology for determination and allocation of crude oil losses. 79. Failure to apply approved new base prover volume and meter factor from proving in a petroleum liquids or natural gas facility. 80. Non-compliance with installation or tampering with Authority locking device or sea line valves on an export line. 81. Tampering with metering systems or ancillary equipment in a midstream facility. 82. Commissioning any critical equipment or facility such as valve, compressor, pump, or sampler in a midstream facility without approval. 83. Failure to display on petroleum liquids operational tank in service the words “Tank Service”, “Date of Calibration” and “Next Due Date of Calibration”. Forfeiture of the cargo and an administrative penalty of 10% of the value of the cargo. USD1,000,000 Forfeiture of the cargo and an administrative penalty of 10% of the value of the cargo. Forfeiture of the cargo and an administrative penalty of 10% of the value of the cargo. 125% of the value of the petroleum liquids backloaded. USD 10,000 and seizure of faulty measuring instrument. NGN 100,000 and seizure of faulty measuring instrument. Monetary equivalent of 30% of the total loss volume allocated at the prevailing oil price in USD. USD50,000 USD150,000 USD100,000 per meter. USD50,000 per piece of equipment. NGN2,000,000 per tank.
RegulationsPDF20252025-1277