Library / B 2103 Federal Republic of Nigeria Official Gazette No. 205
B 2103 Federal Republic of Nigeria Official Gazette No. 205
Page 78 of 82
B 2180 84. Failure to display on petroleum products operational tank in service the words “Tank Service”, “Date of Calibration” and “Next Due Date of Calibration” in a downstream facility. 85. Unauthorised installation of LACT System at export terminals or custody transfer point. 86. Non-compliance with frequency of calibration of measurement, dipping tape, UTI, temperature or pressure gauges, transmitters, probes, etc. in midstream petroleum operations. 87. Falsification of proving system calibration or meter proving reports. 88. Failure to calibrate or recertify metering system ancillary equipment, temperature and pressure gauges, transmitters, etc. 89. Failure to recertify prover loop when due in midstream petroleum operations. 90. Failure to recertify auto sampler when due in midstream petroleum operations. 91. Failure to carry out statutory meter proving when due in midstream petroleum operations. 92. Tampering or unauthorised installation of a dispensing pump or loading gantry meter. 93. Unauthorised changing of petroleum liquids tank product or pipeline product service in midstream operations. 94. Undertaking the survey route for a pipeline without LTE 95. Constructing, operating or maintaining a pipeline without a petroleum pipeline licence 96. Operating a pipeline without an annual permit to operate 97. Failure to remove a pipeline or pipeline network when directed by the Authority. NGN500,000 per tank. USD75,000 per month. USD5,000 per equipment. USD250,000 per prover or meter report. USD5,000 per equipment. USD15,000 per annum. USD50,000 per annum. USD20,000 per proving frequency in addition to any other penalty. NGN500,000 per pump or meter. USD5000 per tank USD500,000 USD4,000,000 in addition to any other penalty USD1,000,000 in addition to the annual permit to operate fee (a) a penalty not exceeding USD2,500,000; (b) removal of the pipeline and any ancillary installation and the person shall make good any damage done to the land by such removal; and (c) where the person in default fails to remove the pipeline as directed, the Authority shall appoint an
RegulationsPDF20252025-1278