Library / Page 1 of 67 MIDSTREAM AND DOWNSTREAM PETROLEUM SAFETY AND ENVIRONMENTAL REGULATIONS, 2025
Page 1 of 67 MIDSTREAM AND DOWNSTREAM PETROLEUM SAFETY AND ENVIRONMENTAL REGULATIONS, 2025
Page 16 of 67
Page 16 of 67 (i) graduated in pounds per square inch or the metric equivalent, and (ii) checked for accuracy at intervals not more than 12 months; (ee) calibration of pressure relief valves, process safety valves, pressure gauges and other process safety equipment shall be certified by accredited persons; (ff) new, repaired, or modified pipework shall be tested in accordance with the American Society of Mechanical Engineers (ASME) working standards or recognised equivalent standards to 1.25 times the maximum allowable working pressure before being put into service; (gg) pressure vessel, equipment and associated piping used in midstream and downstream petroleum operations shall meet internationally recognised standards for monitoring and controlling corrosion, with respect to the design, construction, routine inspection, testing and maintenance; (hh) the following measures shall, in addition to the respective manufacturer’s recommended procedures, be taken in relation to every pressure vessel, equipment and associated piping used in midstream and downstream petroleum operations, that is — (i) non-destructive testing, including UTM, shall be carried out at intervals not less than once in three years to check the rate of both internal and external corrosion and erosion, (ii) when corrosion coupons are used for monitoring the corrosion rate in a pressure vessel, equipment or piping, the results obtained at any given time shall be recorded and made available to the Authority on demand, (iii) when cathodic protection system is chosen for the control of vessel internal corrosion, an appropriate design of the system shall be made to meet internationally recognised standards; (ii) result of the inspection, test and survey carried out under these Regulations shall be made available to the Authority on demand; (jj)permanently placed bulk storage tank containing petroleum liquids shall — (i) be installed within a bund wall capable of containing the contents of the largest tank plus ten percent of the volume of the remaining tanks within the enclosure,
RegulationsPDF16