Page 20 of 67 (j) a pipeline shall not be put into operation unless an approval for its commissioning has been obtained from the Authority; (k) the right of way of every pipeline shall be free of overgrowth of vegetation to allow for free access to carry out operational tests, any other maintenance work and for prompt detection of leakages; (l) pipelines conveying hydrocarbons shall be designed with pigging facility to allow pigging operation. Intelligent pigging shall be conducted at intervals not more than five years. (m) an initial data gathering shall be obtained from any newly commissioned pipeline, and this shall form the basis for the integrity of the facility; (n) pipeline pressure testing shall be carried out at intervals of not more than five years at pressure of at least 125% of the maximum operating pressure; (o) a pipeline running on the surface shall be externally coated to meet the relevant provision of the NACE or equivalent standards to prevent atmospheric corrosion attack; (p) pipeline shall be suitably coated before burial and cathodic protection provided — (i) within 12 months, in the case of dry land, and (ii) within six months, in the case of swamp land, and the cathodic protection system shall be designed and constructed to meet the NACE standards or other internationally recognised equipment standards; (q) cathodic protection potential survey shall be carried out on all buried pipelines at intervals of not more than 24 months to ensure that every section of the protected line attains a negative potential of at least 850mV with reference to copper or copper sulphate reference electrode; (r) the result obtained during a survey carried out under sub-regulation (q) of this regulation shall be recorded and made readily available on demand, and the Authority may appoint officials to witness any periodic survey carried out under paragraph (q); (s) all other applicable safety provisions for the design, construction, commissioning, operation and maintenance of pipelines shall be as stipulated in the current editions of the guidelines issued by the Authority.
RegulationsPDF20