Page 45 of 67 (4) In respect of the decommissioning and abandonment of any installations, structures, utilities, processing plants, pipelines, or other facilities or infrastructure relating to a licence for midstream petroleum operations offshore, the licensee shall make an application to the Authority for approval to decommission and abandon at 24 months prior to the proposed start date of the decommissioning and abandonment programme. (5) An application under sub-regulation 4, shall be accompanied by a decommissioning and abandonment programme in a Form prescribed by the Authority in addition to the requirement for a decommissioning and abandonment philosophy which shall comprise of — (a) description of items to be decommissioned and abandoned, inclusive of diagrams, covering — (i) support structure for offshore fixed and floating installations at the time of removal (type, size, arrangement, and weights), (ii) topsides for offshore fixed and floating installations (type, size, configuration, equipment, and weights), (iii) for pipelines, flow lines and umbilicals – lengths, diameters, type of construction, the extent of burial, trenching and details of any concrete mattresses, frond mattresses, grout bags, rock-dump or other materials used to cover the lines, (iv) details of any subsea facilities that form part of the pipelines, such as production line end manifold, umbilical termination assembly, riser anchor bases as it relates to midstream and downstream operations, (v) information about the stability of the pipelines including details of any spanning or exposure (met-ocean data, survey data and history to support information given in this section should be included as an annex to the decommissioning and abandonment programme, live pipeline survey information may be relevant), (vi) details of interaction between any part of the pipelines and other uses of the sea (in particular fishing activity, marine traffic, marker buoy positioning both historical and where relevant to estimate future activity), and (b) where there is a related equipment that is not covered by the decommissioning and abandonment programme, details shall be provided for such equipment and explanation provided of why it is not part of the programme; (c) proposals for identification and removal of seabed debris following decommissioning and abandonment works; (d) for the removal and disposal methods, details of any materials and remains on the seabed after decommissioning and abandonment;
RegulationsPDF45